Permit Number: T04CM04632
Parcel: 126122250

Address:
4601 E 10TH ST

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T04CM04632
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
11/30/2004 Neil Saunders BUILDING-RESIDENTIAL REVIEW Denied Plan Check Comments - T04CM04632

Plan Review for the above referenced structure has been completed. This letter reflects comments to be addressed. In order to facilitate a shorter back check time, we request that you please provide revised plans and calculations, highlighting any changes, along with a written response to each of the noted items indicating action taken.

General Requirements

1. All corrections and revisions shall be made on the original tracings and two new sets of prints or (1) sepia & (1) blue line shall be returned along with all redline prints.
2. Pen or pencil corrections on final prints will not be acceptable. To avoid delays ensure all corrections have been made, are complete and have been coordinated on all-applicable details and notes.
3. All plans must comply with the 2003 IRC (less the plumbing). Revise all notes and references.

Structural Plan

1. Provide 4' braced wall between bay window and southwest corner of addtion.
2. Specify and detail all over-framing. If solid sheathing is used on the lower trusses, provide minimum openings of 22" by 30" for access and ventilation into over-framed areas (>30 S.F.). If solid sheathing is not used on lower trusses, provide details for bracing of top chord of lower trusses.
3. Foam insulation: Clarify your compliance with R314 on the main walls and those walls to the attic per R314.2.3. Provide barrier between stucco foam and attic space.
4. Optional CMU wall - Provide horizontal reinforcement.
5. Bay window roof ledger cannot attach to trusses. Provide beam over bay window that the bay roof can be attached. Provide H2.5 anchors from bay window walls to rafters.

Plumbing Plan

1. Fixture unit summary is confusing. New fixtures are WC(3 f.u.), Shower(2 f.u.) and Lav(1 f.u.) = 6 fu. Revise and provide total (new and existing should be 23 plus any existing hose bibs) fixture unit summary. Provide total developed length.
2. Fixture Conn. Schedule shows a new kit sink, new water heater and a new washer. Clarify.


If you have any questions, please contact your assigned plans examiner Neil Saunders at 791-5550, extension 1113.

Final Status

Task End Date Reviewer's Name Type of Review Description
12/03/2004 DELMA ROBEY OUT TO CUSTOMER Completed