Permit Review Detail
Review Status: Completed
Review Details: SITE
Permit Number - T04CM04619
Review Name: SITE
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/18/2004 | Jim Egan | FIRE | REVIEW | Denied | 1. Fire hydrants required. Submit approved COT Water Plan. 2. Submit complete code revijew checklist for each new building. |
| 10/21/2004 | Andrew Connor | LANDSCAPE | REVIEW | Denied | 1. The site is subject to the provision of the scenic corridor zone. The review procedure for such projects has changed recently. Refer TCC 23A-50 and TCC 23A-51 for information. (Ord. 9967, eff. 7/01/04) A pre-application conference is required. Contact the Zoning Review Section for additional information. 2. Set Aside requirements include a submittal of an Environmental Resource Report in lieu of performing a Native Plant Inventory per DS 2-15.3.5 Rename Native Plant Preservation Plan as necessary. 3. Boundaries of all set aside areas shall be clearly delineated on an aerial photograph and site plan per LUC 3.8.6.4.D Include on site plan in a surveyable manner, the natural undisturbed area identical to Environmental Resource Report / NPP plan 4. A natural area may be designated as a deed-restricted portion of a privately owned lot or as a separate parcel. To protect the natural areas, covenants, which run with the land, will be provided in favor of the City of Tucson and of all owners with record interest in the natural area per LUC 2.8.1.7 5. Adjacent to the MS&R right-of-way line, a buffer (30) feet wide shall be restored to its natural state per LUC 3.7.5.2.A. Remove existing 30" screen wall within scenic corridor. 6. Within a vehicular use area, 1canopy tree is required for each 10 motor vehicle parking spaces and canopy trees must be evenly distributed throughout the vehicular use area. Every parking space shall be located within forty (40) feet of the trunk of a canopy tree (as measured from the center of the tree trunk) per Additional trees are required within the vehicle use area per LUC 3.7.2.3.A.1.a. |
| 10/22/2004 | ANDREW CONNOR | NPPO | REVIEW | Denied | Set Aside requirements include a submittal of an Environmental Resource Report in lieu of performing a Native Plant Inventory per DS 2-15.3.5 Rename Native Plant Preservation Plan as necessary. |
| 11/08/2004 | Daniel Castro | ZONING | REVIEW | Denied | COMMENTS: Please resubmit revised drawings along with redlines and a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. The following comments are based on a greater than 25% building area expansion resulting in a full code compliance review of the entire site. 1. Per Pima County Assessors Records, the site is comprised of four (4) lots, which must be combined to function as one consolidated parcel by providing a copy of the recorded City of Tucson Lot Combination Covenant. You may obtain a copy of the covenant online at: http://www.ci.tucson.az.us/dsd/Lot_Combo_Declaration.pdf or you may contact me at the number below. (D.S. 2-05.2.4.A) 2. Add legal description to notes. 3. Add project address top notes. (D.S. 2-02.2.1.A.3) 4. What is the function/use of the "new hacienda"? 5. This project is within the Scenic Corridor Zone (SCZ). SCZ approval is required prior to site plan approval. A separate review is required for the SCZ. The case number for this review must be noted in the lower right corner of each sheet of the site, landscape and NPPO plans. All required elements of the SCZ (i.e. 30 foot buffer, view corridors, approved colors, etc..) as shown on the approved SCZ plan must be added to the site plan, along with date of approval and any conditions placed on that approval. A thirty-foot-wide buffer area, adjacent to the future MS & R right-of-way, is to be preserved in place and maintained in its natural state. Maximum height of a structure is one-third the distance of the structure from the future-right-of-way, not to exceed 25 feet in height. Material and/or paint description for areas of structures and signage visible from the Scenic Route are reviewed for colors, which are predominant within the surrounding landscape, such as desert and earthtones. The SCZ process requires that the applicant offer to meet with the adjacent property owners and neighborhood associations. For more information regarding the SCZ application process please contact me at the number provided. (LUC 2.8.2) 6. Minimum building setback required from new classroom to east property line shall be 50 feet (2 x height), per LUC Sec. 3.2.6.4 yard indicator "DD". Site plan shows a 47 foot setback. (D.S. 2-02.2.1.A7) 7. Show wheel stop curbing (concrete bumpers) for all applicable parking spaces on the site plan. If all spaces are to be provided with "concrete bumpers" state as so on the site plan. Wheel stop curbing is required for all vehicle parking spaces abutting a sidewalk less than 6.5 feet wide. (D.S. 2-02.2.1.A.8) (D.S. 3-05.2.3.C) 8. Per LUC Sec. 3.3.3.5, revise the total number of bicycle parking spaces required (21) to be based on the total number of vehicle parking spaces provided (259). 19 Class II spaces required and 2 Class I spaces are required. (D.S. 2-02.2.2.A.4) 9. a) Indicate the location, specific type of rack and the number of bicycle it supports for bicycle parking. b) Provide a fully dimensioned detail for Class II bicycle parking. Refer to D.S. 2-09 for design criteria. 10. Indicate graphically or by note compliance with paving requirements for all existing and proposed vehicular use areas. 11. Numerous two-way drives (PAAL's) do not meet the minimum width of 24 feet. Assure that all two-way drives meet compliance. (LUC Table 3.3.7-I) 12. All buildings must be provided with a continuous on-site pedestrian circulation system which provides pedestrian access to the right-of-way in compliance with provisions in D.S. 2-08. Within this pedestrian circulation path, an accessible route is also required. The accessible route must connect all areas of the development and the pedestrian circulation path located in any adjacent streets. This accessible route may be identical to the pedestrian circulation path. 13. Provide a sidewalk between the parking spaces and the existing classroom located near the east property line. (D.S. 2-08.4.1.C) 14. Dimension the width of the sidewalk north of the new fellowship hall. Minimum five (5) foot pedestrian refuge area is required between a building and a PAAL. (D.S. 3-05.2.2.B.1) 15. If applicable, provide a detail of existing and/or proposed free-standing signage/billboard and outdoor lighting on the site plan. (D.S. 2-02.2.1.A.13) (D.S. 2-02.2.1.A.25) 16. Add the following general note: "This use does note require a loading zone." (D.S. 2-02.2.1.A.14) 17. Label and dimension location of future curb along Ironwood Hills Road. (D.S. 2-02.2.1A.21) 18. Keynote 21 indicates an existing light pole to remain in the middle of a PAAL. Please relocate. 19. Under general note 2, revise the word "facilities" to "use." 20. Revise the zoning classification for the adjacent properties to the east from RX-2 to R-1 on the site map sheet 1 of 3. 21. Revise site plan to show proposed conditions (what the site is going to look like) only. Existing conditions which, will be removed or eliminated make the site plan harder to read and in most cases are not necessary for a site review since they will no longer exist. 22. Dimension all angle parking spaces to remain. Dimensions shall meet LUC Table 3.3.7-I requirements. 23. Provide the F.A.R. calculation. The plan provides the proposed number but it should show the complete calculation. 24. Provide the lot coverage calculation. The plan provides the proposed number but it should show the complete calculation. 25. Provide the percentage of building area expansion and vehicular use area expansion. (D.S. 2-02.2.1A.6) 26. Dimension the width of the drop off area zone. 27. If a Board of Adjustment Variance is applied for and approved, please list the follwing as a general note: case number, date of approval, variances granted, conditions imposed. In addition, provide a copy of the Board of Adjustment decision letter with the resubmittal of this plan. 28. All requested changes must be made to the site and landscape plans, where applicable. (D.S. 2-07.2.1.A) If you have any questions about this transmittal, please call Dan Castro, (520) 791-5608 ext. 1180. An appointment is required to discuss these comments in person. |
| 11/09/2004 | DAN CASTRO | HANDICAP-SITE | REVIEW | Denied | refer to Zoning Review comments |
| 11/16/2004 | Doug Williams | ENGINEERING | REVIEW | Denied | SUBJECT: Hydrologic/Hydraulic Report and Site plan DATE: 17 November 2004 ACTIVITY NUMBER: T04CM04619 T14S, R13E, Section 5 Engineering Division has reviewed the Subject items. Approvals are not recommended at this time. Proposed grading and finished floor elevations indicate differential grading criteria must be met for this proposed development. Please refer to Development Standard 11-01.8.1, available at the following link: http://www.ci.tucson.az.us/dsd/DevStd1101.pdf for information relating to this requirement. PLEASE ASSURE THIS MATTER IS ADDRESSED EARLY IN THE PLANNING/DEVELOPMENT PROCESS (DS 11-01.8.1 A 3). Resubmittal will require a revised site plan, a revised Hydrologic and Hydraulic report, and a response letter addressing all of the following comments: HYDROLOGIC AND HYDRAULIC REPORT: 1. Show onsite drainage conditions on a topo map having a scale of a minimum of one inch equals 40 feet, with one foot contour intervals (the site or grading plan may be modified for this purpose). Show on this map: (a) watershed boundaries (b) all points of drainage concentration, and (c) flowlines and grade breaks used to compute basin lengths and average watercourse slopes, at a minimum (DS 10-02, Section 2.3.1.3 B 2). 2. Provide the following additional details on the site plan, as a part of the report: dimensions of all proposed detention/retention systems, including (a) location, size and type of inflow and outflow structures with dimensions and elevations of critical portions of each structure; (b) location(s) and size(s) of maintenance access ramps; (c) clearly marked dimensions of all building setbacks with dimensioning between structures and any proposed basins provided; (e) locations and types of any security barriers to be installed; and (f) erosion protection (riprap) with sizing and dimensions included (DS 10-02, Sec. 2.3.1.6 A 4 and DS 10-01.5.2.6). 3. For each significant watercourse (1 acre or greater in size) entering or leaving the site, the contributing drainage area with flow arrows and the 100-year peak discharge must be shown (DS 10-02.0, Sections 2.3.1.4 C 4 & 5.2.4). 4. Provide a very detailed Detention/Retention Basin Maintenance Checklist and Schedule in the report (DS 10-02 Sec. 2.3.1.6 C 1). 5. As part of the basin maintenance checklist, state that the annual inspection report shall contain the following summaries: (provide language in the report verbatim, as written in DS 10-02 Sec. 2.3.1.6 C 2 a & b). 6. A soils report is required to be submitted in conjunction with the design of each surface storage facility which utilizes infiltration as a method of basin drainage. The report shall contain at a minimum, technical information on soil classification, erodibility, permeability, slope stability, groundwater elevation, infiltration rates, recommended minimum building setbacks (from basins and drainageways), whether or not hydro-collapsing soils are present, and contain the results of a minimum 30 foot deep soil boring. (Pima County/City of Tucson Stormwater Detention/Retention Manual - DS 10-01, Section 3.5.1.5). 7. Address/discuss and provide appropriate design for detention/retention basin embankment/emergency spillway requirements in the report (DS 10-01 Section 3.3.4). 8. Provide retention basin percolation test results in the revised drainage report. Include discussion/analysis of the test results to assure the maximum allowed time of disposal would not be exceeded for each basin (DS 10-01.0, Sec. 3.5.1.3). 9. Correct the Section to 5 in the location description in the first paragraph, page 1. 10. Please refer to Chapters III and IV of the Stormwater Detention/Retention Manual for additional retention/detention design guidelines (DS 10-01.0). SITE PLAN: Please note that revisions to the drainage report may result in necessary revisions or additions to the site plan. Please assure all revisions are depicted on a revised site plan. 1. Depict and label existing and future sight visibility triangles based upon future curb location for Ironwood Hill Drive, per the City's Major Streets and Routes (MS&R) Plan & Development Standard (DS) 2-02.2.1 A 10 & DS 3-01.5.B 2. 2. Depict drainage patterns and finish grades (DS 2-02.2.1 A 16). 3. Provide estimated cut/fill quantities (DS 2-02.2.1 A 17). (Items 2 and 3 above may be addressed on a grading plan) 4. Provide the type of 30' easement depicted/labeled on the western portion of the site (DS 2-02.2.1 A 20). 5. Depict refuse container location(s), size and access thereto fully dimensioned. Please assuring 36' and 50' inside and outside turning radii are depicted on the plan (DS 2-02.2.1 A 32). 6. New commercial developments will provide on-site refuse storage, collection, and pickup areas with service access from within the tract or from an alley adjacent to the tract (DS 6-01.4.1) 7. Provide 18' minimum unobstructed radii at all locations where a Parking Area Access Lane (PAAL) intersects another PAAL, where emergency and/or solid waste vehicles must maneuver (DS 3-05.2.1 C 3 a). 8. Provide a typical dumpster enclosure detail and specify a minimum 5" thick concrete slab, with bollards to be placed on the rear and side walls of the enclosure, if required. Assure a minimum of 20 feet between sidewall bollards is dimensioned (DS 6-01.4.0). Please refer to this Development Standard for additional requirements for service areas, container placement and access requirements. 9. Depict, label and dimension basin maintenance access ramps on the site plan (ref. drainage report comment # 2). A grading permit will be required for this proposed development. Three sets of Grading and Stormwater Pollution Prevention Plans (SWPPP's) with text must be submitted with a grading permit application for review and approval by this office prior to any clearing of land, excavation, trenching or other new construction onsite. The SWPPP text must contain specific description and discussion addressing all required items for stormwater pollution prevention relating to this proposed development, as outlined in the construction SWPPP Checklist available at the following link: http://www.adeq.state.az.us/environ/water/permits/download/cswppp.pdf. Assure a copy of the Arizona Pollutant Discharge Elimination System (AZPDES) General Permit is included in the text and that each submittal contains a signed copy of the Notice of Intent (NOI) as submitted to Arizona Department of Environmental Quality (ADEQ). The SWPPP should be consistent with the Site and Grading Plans and Hydrologic and Hydraulic report. Listed below are some items that must be included with a resubmittal. For additional information regarding SWPPP content specifications, go to: http://www.azdeq.gov/function/forms/appswater.html Please visit the links provided for complete SWPPP preparation/requirements. Listed below are some items that must be provided, at a minimum: 1. Provide the project owner/operator's name and signature with date 2. Provide a copy or copies of signed owner/operator certifications with the resubmittal. 3. Depict and label an appropriate washout location. 4. Depict and label a sediment trap or basin (optional). 5. Depict and label an appropriate protected material storage area. Resubmittal will require a revised Hydrologic and Hydraulic Report and a revised Site Plan addressing all items listed above. Subsequent comments may be necessary upon resubmittal, depending upon the nature and extent of revisions to the plan and/or report. If you have any questions, I can be reached at 791-5550, extension 1189 or Dwillia1@ci.tucson.az.us Douglas Williams Sr. Engineering Associate Engineering Division Development Services Department |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 11/18/2004 | DELMA ROBEY | OUT TO CUSTOMER | Completed |