Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T04CM04588
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/14/2004 | JIM EGAN | FIRE | REVIEW | Approved | |
| 10/14/2004 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Passed | |
| 10/14/2004 | RAUL PALMA | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 10/14/2004 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 10/14/2004 | PETER MCLAUGHLIN | ZONING | REVIEW | Approved | |
| 10/14/2004 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
| 10/14/2004 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | DENIED 10/14/04 1. Add power requirements for new accent lights to fixture schedule. 2. Circuit A-5, with 24 LF of track lighting, shall be counted as (75) (24) = 1800 VA, which is well above the 950 VA on the panel schedule. Then add the accent lights. Count all as continuous load in load calculation. NEC 220.12 (B). 3. Identify power receptacle on power pole. 4. Circuit A-6, with 5 duplex and 2 quad receptacles, would have (9) (180) = 1620 VA, plus the load on the power pole per Comment #3 above. 5. Panel load calculations shall use demand factors of 1.25 for all continuous loads and largest motor on feeder. |
| 11/08/2004 | DROBEY1 | WWM | REVIEW | Needs Review | |
| 11/08/2004 | PATRICIA GILBERT | ENGINEERING | REVIEW | Approved |