Permit Review Detail
Review Status: Completed
Review Details: OTHER
Permit Number - T04CM04581
Review Name: OTHER
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/27/2004 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T04CM04581 DENIED 10/27/04 1. Lighting fixtures are on Ckts N-2 and N-10 according to the panel and circuit designation on Lighting Plan. Individual fixtures on Lighting Plan are on Ckts 4, 2, and 10. Lights are on Ckts 4 and 10 on panel schedule. Please clarify. 2. There are 2 receptacles without a circuit designation, north side. 3. Receptacles on Ckt N-1, N-3, and N-5 according to the panel and circuit designation on Electrical Plan. N-1 is a spare. Identify which receptacles are to gon on which circuit. 4. Identify panel and circuit on plans for AC. 5. It appears that total for Phase B on panel schedule is 4910, not 3910. 6. It appears that total for Phase C on panel schedule is 5810, not 5370. Correct for high leg as well. Check all totals. 7. Show location of panel N on plans. 8. The #6 GND between the new disconnect and the gutter consists of a redundant path to ground. Pls remove. 9. Panel A appears to be powered from both sides of the line diagram. Pls clarify. 10. The #2 GND between the termination can and the CT can consists of a redundant path to ground. Pls remove. |
| 11/10/2004 | EGRANT1 | WWM | REVIEW | Needs Review | |
| 11/10/2004 | EGRANT1 | ENGINEERING | REVIEW | Needs Review |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 11/10/2004 | BETH GRANT | OUT TO CUSTOMER | Completed |