Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T04CM04534
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/30/2004 | Daniel Castro | ZONING | REVIEW | Denied | Building plans may not be approved until the site plan has been approved by all sections and the building plans have been approved by Building Review. |
| 12/01/2004 | Robert Sherry | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. The Pima Department of Environmental Quality must approve the design of the private sewer collection system prior to a review by Development Services of the City of Tucson. Provide plans stamped by PCDEQ. 2. Revise the size of the rain water leader beginning at L-12 to comply with the sizing shown in Table D-2 (1/8" Slope), UPC 1994. The roof drain and overflow (located over room 134) drain 2811 square feet of roof. If the pipe has a slope of 1/8"/foot, a 4" pipe can only handle 2506 square feet of roof. 3. Revise the sleeve for the underslab gas piping in room 109 to provide a vent to the outside. Show how the sleeve is physically configured to meet the intent of the plumbing code. Reference Section 1211.3 (exception), UPC 1994, as modified by the State of Arizona. 4. The 3" waste line shown on detail 1/P202 is carrying 36 fixture units; the maximum capacity of a horizontal 3" waste line is 35 fixture units. Reference Table 7-5, UPC 1994. |
| 12/02/2004 | Christy Foreman | BUILDING-COMMERCIAL | REVIEW | Approved | CITY OF TUCSON DEVELOPMENT SERVICES STRUCTURAL REVIEW COMMENTS DATE: 12-03-04 ACTIVITY NUMBER: T04CM04534 PROJECT NAME: SAN MIGUEL CATHOLIC HIGH SCHOOL ADMINISTRATION / CLASSROOM BUILDING PROJECT ADDRESS: 212 W. MEDINA, BLDG. 1 ARCHITECT / ENGINEER: KIM FERRANTI, ABA ARCHITECTS PROJECT REVIEWER: CHRISTY FOREMAN TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 791-5550 X1108 OR EMAIL AT CFOREMA1@CI.TUCSON.AZ.US IF YOU CARE TO DISCUSS. 12-6-04 Stuctural Engineer faxed the additional structural calculation required, therefore I am able to approve. 1) CLARIFY F7 FOOTING CALCULATIONS. - APPROPRIATE DESIGNATIONS NEED TO BE SHOWN ON STRUCTURAL CALCULATIONS AND DRAWINGS. |
| 12/02/2004 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Approved | |
| 12/02/2004 | Linda Buczynski | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 12/10/2004 | DOUG WILLIAMS | ENGINEERING | REVIEW | Denied | Building plans may not be approved until the site plan has been approved by all sections and the building plans have been approved by Building Review. |