Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T04CM04204
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/20/2005 | JIM EGAN | FIRE | REVIEW | Denied | 1. Fire hydrants required submit approved COT Water Plan. 2. Inadequate exterior openings per 2003 IBC Sec.903.2.10 |
| 07/20/2005 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Revise the energy code compliance calculations using the current code and show that the building meets the code requirements. Reference Section 101.2, International Energy Conservation Code 2000. 2. Specify the minimum resistance (R-value) of the duct insulation to be used on this project. Reference Section 803.2.8, IECC 2000. 3. Specify the type and size of the flues for the unit heaters and show how the unit heaters are to be mounted to the structure. |
| 07/21/2005 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Comment not addressed. Provide the minimum plumbing facilities required by Table 2902.1, IBC 2003, for business occupancy. 2. Comment not addressed. Revise the site drawing to show the location and size of the water meter and the size of the reduced pressure backflow preventer assembly. Reference Section 103.2.3, UPC 1994. 3. Comment not addressed. Revise the site drawing to show the slope of the building drain and the required cleanouts. Reference Section 103.2.3, UPC 1994. 4. Comment not addressed. Provide the rim elevation of the next upstream and the next downstream sanitary manholes and the first floor elevation. Determine the need for a backwater valve per Section 710.1, UPC 1994. 5. Comment not addressed. Provide material standards for all plumbing fixtures being provided by others. Justify rating the two sinks as "bar sinks". (Note: the minimum waste size for a commercial bar sink is 2".) Revise the plumbing fixture schedule as required, using the fixture unit values shown in Tables 6-3 and 7-3, UPC 1994. Reference Section 703.1, UPC 1994. 6. Clarify the specifications of the water heater; the model number represents a dual element unit wired for 240 volts and 4500 watts and not as shown on the water heater schedule. Reference Section 103.2.3, UPC 1994. 7. Include all of the water fixtures (i.e. hose bibbs) and all of the water requirements of the HVAC equipment (i.e. 4 evaporative coolers, not just one) when calculating the total demand and determining pipe sizes. Reference Section 610.1, UPC 1994. 8. Complete the provided water calculations to show the design pressure drop for the water supply piping system. Note: the lift portion of the calculations is for the elevation difference between the meter and the highest water outlet (e.g. the evaporative coolers). Use the method shown in Appendix A to size the branch piping as well as the main water supply. Reference Section 610.5, UPC 1994. 9. The fixture connection sizes called out for the flush valve will result in water velocities greater than 8 FPS. Limit the water velocity to less than 8 FPS for the copper piping. Reference Section A 6.1, UPC 1994 and IAPMO IS 3-93, Section 610.0. 10. Provide upper terminal cleanouts on horizontal drainage pipes exceeding 5 feet in length (horizontal drain lines serving sinks and urinals require cleanouts regardless of length). Reference Section 707.4, UPC 1994. 11. Revise the routing of the building drain as necessary to comply with the requirements of Section 313.3, UPC 1994. 12. Resize the natural gas piping per Section 1217.0, UPC 1994 with AZ State amendments. |
| 07/26/2005 | BOB SUBA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | 1.plan needs to be ledgible and clear enough to be reduced to microfish for future use by others. 2.provide the actual available fault current and the equipment ratings to comply with the fault values. |
| 08/09/2005 | GERRY KOZIOL | WWM | REVIEW | Denied | 1: Trade service building 2:fronts 12" public sewer/ needs to connect to a M.H. new or exsist. 3: needs par/non-par wastewater evaluation-5th floor. |
| 08/12/2005 | ANY | ENGINEERING | REVIEW | Approved | |
| 08/26/2005 | RAUL PALMA | BUILDING-COMMERCIAL | REVIEW | Denied | City of Tucson, Development Services BUILDING AND STRUCTURAL COMMENTS 8/26/05 1) Specify use of building. Provide a code review checklist. 2) Provide details of all interior partitions, show connection at top and bottom of partition. 3) Provide automatic sprinklers per Section 903.10.1 or comply with exceptions. 4) Provide details showing that all bathroom fixtures are in compliance with ADA. Show all dimensions at waterclosets, grab bars, etc,. 5) At optional overhead doors provide details of future lintels(size). 6) Sheet a4 keynote 8 indicates a loft. How does one get up there? Where are the stairs? If stairs are provided provide calcs and structural details. 7) For MEC`s see mechanical reviewers comments. 8) Sheet 2 of calcs shows IBC 2000 instead of 2003 rectify! 9) Special inspection required for structural masonry and field welding. 10) Provide a complete analyses for seismic and include loft area. Show all work. |
| 09/09/2005 | DAVID RIVERA | ZONING | REVIEW | Denied | 09/09/05 Development Services Department Zoning Review Section David Rivera Principal Planner Comments: 1. Zoning has reviewed the building plans but cannot approve them at this time. Zoning will re-review and approve the building plans on the next submittal providing the stamped and approved site plans are included with the building plan package. 2. Two copies of the approved and stamped site plan, landscape and NPPO plans must be included with building plans. 3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved site and landscape plans. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 09/12/2005 | GBONILL1 | OUT TO CUSTOMER | Completed |
| 09/12/2005 | SUE REEVES | REJECT SHELF | Completed |