Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL NEW
Permit Number - T04CM03979
Review Name: COMMERCIAL NEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/01/2004 | Jim Egan | FIRE | REVIEW | Approved | |
09/16/2004 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Passed | |
09/16/2004 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Show the size, routing and termination of the condensate drain for the air conditioner. Condensate drains that terminate at or above grade outside the building must terminate in an area that is capable of absorbing the condensate flow without surface drainage. Reference Sections 307.2.1 and 307.2.2, IMC 2000 with local amendments. |
09/16/2004 | ROBERT SHERRY | WATER | REVIEW | Passed | |
09/17/2004 | Linda Buczynski | ELECTRICAL-COMMERCIAL | REVIEW | Denied | TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 791-5550 X1106 OR EMAIL AT Linda.Buczynski@tucsonaz.gov IF YOU CARE TO DISCUSS. 1. Please provide panel (feeder) load calculations and service load tabulation per NEC Article 220. 2. Reference Sheet E-7 and fixture cut sheets, it does not appear that fixture D meets the requirements of the Outdoor Lighting Code. Please provide full cutoff fixture, or drop wattage to 50W. 3. It is not clear from the cut sheet that Fixture D is suitable for a wet location. Please clarify. 4. There is a 5 KW unit heater on the Equipment Schedule Item 7 Sheet E-18. Not on plans or panel schedule. Please clarify intent. |
10/01/2004 | DOUG LAAKSO | BUILDING-COMMERCIAL | REVIEW | Denied | T04CM03976 .. 475 E ELVADO ROAD .. CONTROL BUILDING #2 .. .. T04CM03977 .. 900 E SUSANA STREET .. CONTROL BUILDING #1.. .. T04CM03978 .. 900 E SUSANA STREET .. WALL AND ENCLOSURE .. .. T04CM03979 .. 900 E SUSANA STREET .. CONTROL BUILDING #3 .. .. DGL .. .. BUILDING COMMENTS - 1st REVIEW S1. Stepped foundations drawing CS-12, revise bottom of footings to comply with IBC Sec 1805.1, slope may not exceed 1:10 vs 1:2 on stepped footing details. S2. Provide locations for buildings and structures by dimension from two adjacent property lines for each building or structure permitted. S3. Provide structural calculations for footings and foundations , including stemwalls and address pipe and cable support design , attachment to and loads on masonry walls. S4. Provide Inspection Program for Special Inspections required by Uniform Administrative Code Section #306, as amended . S5. Special Inspection required for : 1. Masonry 2. Foundation excavation 3. Concrete 4. Field welding 5. Backfill S6. Provide shop drawings for : 1. Precast concrete roof panels 2. Grating S7. Detail connection of blocking to precast , ref details side bearing , edge flashing , end bearing option 1 and end bearing option 2, on drawing #CS-04. S8. Field bending of reinforcing in masonry is not acceptable , please provide corner bars as dowels where required , ref side bearing and end bearing on drawing #CS-04. S9. Provide complete structural calculations for buildings including lateral analysis and connection details. S10. Provide toilet , ramps and level landings at mandoors , revise plans and show accessibile route per IBC and ANSI A117.1-1998 ed. S11. Provide complete structural design including calculations and drawings for equipment platforms. S12. Provide complete structural design including calculations and drawings for above ground tanks over 5000 gallons. S13. Provide complete architectural and structural design including calculations and drawings for control building #2 and control building#3. Questions? Call Douglas Laakso Structural Plans Examiner for the City of Tucson Development Services Department at (520) 791-5550 x1111 |
10/02/2004 | DAN CASTRO | ZONING | REVIEW | Passed | |
10/05/2004 | LOREN MAKUS | ENGINEERING | REVIEW | Passed | |
10/05/2004 | Gerry Koziol | WWM | REVIEW | Passed |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
12/07/2004 | LISA LESNY | OUT TO CUSTOMER | Completed |
12/07/2004 | ANGIE SHOFFSTALL | REJECT SHELF | Completed |