Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T04CM03956
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/31/2004 | JIM EGAN | FIRE | REVIEW | Approved | |
08/31/2004 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Show how water is to be connected to the relocated ice machine, including the required backflow protection. 2. Indicate where the ice machine is to be drained. |
08/31/2004 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T04CM03956 DENIED 8/31/04 1. On Sheet A2 Oven is specified as 6000W, 240/208V. On Panel Schedule Oven is 1800W, 120V. Please coordinate and clarify. 2. Oven Warmer on Sheet A2 draws 12.3A. According to panel schedule at 0.75 KVA this equipment would draw only 6.25A. Please clarify. 3. Existing 60A Load Center is overloaded according to the panel load calculations submitted. Suggest the use of NEC Table 220.20 to determine compliance. |
08/31/2004 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Clarify how the existing hood is to be modified. |
08/31/2004 | DAN CASTRO | ZONING | REVIEW | Approved | |
08/31/2004 | PATRICIA GILBERT | ENGINEERING | REVIEW | Approved | |
10/01/2004 | TACHONG1 | WWM | REVIEW | Needs Review | |
10/01/2004 | TACHONG1 | BUILDING-COMMERCIAL | REVIEW | Needs Review | |
10/01/2004 | TACHONG1 | WATER | REVIEW | Needs Review |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
10/01/2004 | TAMI ACHONG | OUT TO CUSTOMER | Completed |