Permit Number: T04CM03934
Parcel: 110055330

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T04CM03934
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/15/2004 CHRISTY FOREMAN BUILDING-COMMERCIAL REVIEW Denied 1. Required clearance for water closet. no ptrusion allowed into clearance space see section 307.2 ANSI A117.1.
2. Fastener attachment would penetrate roof membrane. Clarify?
09/15/2004 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Provide statistical data referenced in the response letter; specifically for the break room, conference room, and the lobby.
09/15/2004 LINDA BUCZYNSKI ELECTRICAL-COMMERCIAL REVIEW Denied TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL.

PLEASE CALL AT 791-5550 X1106 OR EMAIL AT Linda.Buczynski@tucsonaz.gov
IF YOU CARE TO DISCUSS.

1. "There is electrical load on Ckt P-9 on Lighting Plan. Document such on panel schedule." UNRESPONSIVE. Put electrical load for Office Lights on Panel P Circuit 9.
2. "Provide panel and circuit number for conference room lights" THIS COMMENT WAS MADE ON THE FIRST SUBMITTAL. It appears that electrical load on P-3, which not powers both the Break Room and the Conference Room lights, should show a minimum of 1.1 VA, not 0.4.
3. "Ckt P-22, with 7 receptacles, shall have a minimum load load of 1260 VA, which is greater than the 0.4 KVA indicated on the panel schedule" THIS COMMENT WAS MADE ON THE FIRST SUBMITTAL. Ckt P-22, with 5 receptacles, shall have a minimum load load of 900 VA, which is greater than the 0.4 KVA indicated on the panel schedule.
4. The Water Heater is 1500 W according to Sheet P1, and 500 VA on Ckt P-35. Coordinate with Plumbing and clarify was wriiten upon first submittal.
5. Specify interrupting rating of the new fuse at the service disconnect, as requested on first submittal.
09/15/2004 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Revise the sizes of the water piping based on Section 610.4, UPC 1994, Appendix A is not appropriate due to the project conditions.
2. Correct the fixture units shown on the fixture unit schedule for the existing hose bibb.
09/23/2004 TACHONG1 ENGINEERING REVIEW Needs Review
09/23/2004 TACHONG1 ZONING REVIEW Needs Review
09/23/2004 TACHONG1 WWM REVIEW Needs Review

Final Status

Task End Date Reviewer's Name Type of Review Description
09/23/2004 TAMI ACHONG OUT TO CUSTOMER Completed