Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T04CM03934
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/30/2004 | CHRISTY FOREMAN | BUILDING-COMMERCIAL | REVIEW | Approved | 1) PROVIDE CODE CHECK LIST. 2) ANSI STANDARDS 604.3.2 CLEARANCE FOR WATER CLOSET. CLARIFY. 3) CLARIFY SECURING OF 2HR WALL TO ROOF DECK. |
| 08/30/2004 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide access to the water heater, Reference Section 511.2, UPC 1994. 2. Revise the size of the water pipes per Section 610.4, UPC 1994. 3. Include all of the water fixtures in the fixture unit calculations (e.g. hoe bibb). Reference Section 610.1, UPC 1994. 4. The minimum pressure required for the specified water closet is greater than 15 psig. 5. Show that the faucet to be installed in the P-1 fixtures and the shower comply with the water conservation requirements and material standards of the 1994 UPC as modified by the State of Arizona. 6. Coordinate the DCW and DHW Isometric detail with the plumbing plan. 7. Provide a waste and vent riser diagram. 8. A 2" cleanout is not adequate for a 3" waste line. Reference Section 707.11, UPC 1994. 9. Provide an upper terminal cleanout for the waste piping in the bath room.. Reference Section 707.4, UPC 1994. 10. Show that the shower is handicapped accessible. |
| 08/30/2004 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 08/30/2004 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide statistical data to justify using the exception to Section 403.3 for the occcupant load. 2. Revise the ventilation calculations to show the outside air requirements by A/C unit and show how the outside air supplied by the units complies with Section 403.3.2, IMC 2000. 3. Coordinate the amount of outside air shown in the calculations with the outside air noted on the mechanical plan. |
| 08/31/2004 | JIM EGAN | FIRE | REVIEW | Approved | |
| 09/01/2004 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | |
| 09/15/2004 | LLESNY1 | WWM | REVIEW | Needs Review | |
| 09/15/2004 | LLESNY1 | ZONING | REVIEW | Needs Review | |
| 09/15/2004 | LLESNY1 | ENGINEERING | REVIEW | Needs Review |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 09/15/2004 | LISA LESNY | OUT TO CUSTOMER | Completed |