Permit Number: T04CM03844
Parcel: 113070040

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T04CM03844
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/26/2004 Peter McLaughlin ZONING REVIEW Denied SITE PLAN TRANSMITTAL

TO: Richard Giacetti
1636 N. Swan Rd #201
Tucson, AZ 85712


FROM: Peter McLaughlin
Senior Planner
FOR: Patricia Gehlen
Principal Planner

PROJECT:
T04CM03844
Wells Fargo Bank addition
2825 N. Campbell Ave. (2nd review)

TRANSMITTAL: October 26, 2004

Upon completion of the following revisions/additions, an over the counter review may be arranged to obtain stamped approval by the zoning review section without resubmitting the site plan. The following item must be revised on or added to the site plan:

1. Revise percent expansion calculation to read 4.2 percent for each expansion rather than 0.042 percent. Add the cumulative building area expansion (approximately 8.5 percent) to the plan data. DS 2-02.2.2.A.6

2. Add the address of the site to the site plan sheet A 1.1. DS 2-02.2.1.A.2

3. Because the proposal is more than a remodel, add the word addition to the project title, remove the words "no expansion" from the project name on sheet A0.1, and obtain a yellow site review card from the permitting clerks.


If you have any questions about this transmittal, please call Peter McLaughlin, (520) 247-1027 x1179 .
10/27/2004 Raul Palma BUILDING-COMMERCIAL REVIEW Denied City of Tucson, Development Services
BUILDING AND STRUCTURAL COMMENTS


1) Provide complete masonry wall calculations.

10/28/04

1) How was the #5 @ 48" o.c. obtained???
2) How was 18.2 obtained???
3) What does the 80 mean? Is it a roof load ? wind speed? Combination of loads?
Specify and clarify! Where does the value 623 come from?
4) Re; masonry jamb, how were the 2-#5 arrived at?
5) What is the 17 on sheet 1? Itemize the roof and its framing.
6) Specify in general notes that the design is per 2003 IBC.

Final Status

Task End Date Reviewer's Name Type of Review Description
11/10/2004 BETH GRANT OUT TO CUSTOMER Completed
11/10/2004 ANGIE SHOFFSTALL REJECT SHELF Completed