Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T04CM03806
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/23/2004 | JIM EGAN | FIRE | REVIEW | Approved | |
| 08/23/2004 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Passed | |
| 08/23/2004 | DAN CASTRO | ZONING | REVIEW | Approved | |
| 08/23/2004 | MELISSA POULIN | WWM | REVIEW | Approved | |
| 08/23/2004 | PATRICIA GILBERT | ENGINEERING | REVIEW | Approved | |
| 08/23/2004 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Provide information to show that the ventilation for this project meets the requirements of Section 403.3, IMC 2000. |
| 08/23/2004 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 08/24/2004 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T04CM03806 DENIED 8/24/04 1. Provide CB on Pnl P1 for AC-1. 2. Account for continuous load on both AC-1 and AC-2 in panel load calculations. 3. P2, Ckts 6, 8, 10, and 12 all appear to have 720 VA, not 540. 4. P2-18 appears to have 360 VA, not 180. 5. Please count show windows and signs as continuous loads in load calculations. 6. Up-Over-Down is not an acceptable method to attenuate fault current for downstream panels. Either fully rate or series rate panels for AFC. |
| 09/07/2004 | DOUG LAAKSO | BUILDING-COMMERCIAL | REVIEW | Denied |