Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/16/2004 | Jim Egan | FIRE | REVIEW | Approved | |
08/17/2004 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide plans sealed by an Arizona Registrant. 2. The relevant code for the City of Tucson is the 2000 International Mechanical Code. See the web site for a list of the current codes and the local amendments: http://www.ci.tucson.az.us/dsd/Codes___Ordinances/Building_Codes/ 3. Provide calculations demonstrating adequate ventilation. Reference Section 401, IMC 2000. 4. Refer to Section 606, IMC 2000 for the requirements for in-duct smoke detectors. 5. Show that a separation of at least ten feet exists between air intake openings and exhaust openings. Reference 401.5, IMC. 6. Provide information about the hood for the hot plate and show how it meets the requirements shown in Section 502, IMC 2000. |
08/17/2004 | Robert Sherry | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide plans sealed by an Arizona Registrant. 2. The relevant code for the City of Tucson is the 1994 Uniform Plumbing Code with State of Arizona amendments. 3. Provide a schedule of waste fixture units for all plumbing fixtures using the values shown in Table 7-3, UPC 1994. Include the total number of each fixture being installed. Reference Section 703.1, UPC 1994. 4. Provide a schedule of water fixture units for all plumbing fixtures using the values shown in Tables 6-3 or A2, UPC 1994. Include the total number of each fixture being installed. Reference Section 610.3, UPC 1994. 5. Provide the minimum plumbing facilities required by Table 2902.1, IBC 2000, for business occupancy. 6. One of the specified fixtures (Speakman eyewash) requires a minimum pressure greater than the 25-PSI used in the water pipe sizing calculations. Revise calculations as necessary. Reference Section 608.1, UPC 1994. 7. Provide natural gas pipe sizing calculations. Include gas pressures and developed pipe lengths on plans. Reference Section 1217.0, UPC 1994 with AZ State amendments. Note: altitude is greater than 2000 feet. 8. Show the termination point for the vacuum pump exhaust. Reference Section 103.2.3, UPC 1994. 9. Coordinate the general notes on sheet P-3 with the actual design. |
08/17/2004 | ROBERT SHERRY | WATER | REVIEW | Approved | |
08/19/2004 | Gerry Koziol | WWM | REVIEW | Denied | needs wastewater 8th floor credit/evaluation- needs ww/iwc review or X-ray processing, Tom Tomchak: 579-5771. |
08/31/2004 | BOB SUBA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | 1.Provide A.I.C. ratings at subpanels A,B,and H. Also provide calculations.2.Install equipment grounding condctor from main switchboard to panel H or indicate the type of metalic conduit system. 3.Provide panel H load. 4.Calculate all continuous loads at 125% as defined in N.E.C. . 5.Indicate existing service lateral conductors and justify the service being adequate. 6.All references to electrical code need to reflect the N.E.C. or NFPA-70 as adopted by the City of Tucson. |
09/10/2004 | Raul Palma | BUILDING-COMMERCIAL | REVIEW | Denied |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
09/16/2004 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |