Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T04CM03713
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/12/2004 | JIM EGAN | FIRE | REVIEW | Approved | Type 1 Kitchen exhaust hood w/ fire suppression system required. |
08/12/2004 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Passed | Resize the gas line to the new range. Reference Section 1217.1, UPC 1994. |
08/12/2004 | CHRISTY FOREMAN | BUILDING-COMMERCIAL | REVIEW | Approved | 1)Clarify and explain mixed occupancy use. 2)Provide site plan with property lines. 3) Show all bldgs and locate tenant space clarifying location of restroom and calculations justifying adequate fixtures are provided. Dimension distance from restroom to tenant space along a accessable path. 4)Where is sht. A-3? 5) Clarify walls being removed are non-bearing or provide structural analysis. 6) Provide structural analysis for kitchen hoods. 7) Additional review may be required depending on what is shown on sht. A-3. |
08/12/2004 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Approved | Provide Type I grease hoods for the three ranges located in the cooking classroom. Reference Section 507..2.2, IMC 2000. |
08/12/2004 | ANY | ENGINEERING | REVIEW | Approved | Site plan required. |
08/18/2004 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Approved | T04CM03713 DENIED 8/12/04 1. Conductor size for oven. #12 too small for 40A CB. 2. Receptacles are on Ckt B-1 on Electrical Plan. Panel Schedule indicates lighting. Please clarify. 3. Ckt B-16 appears to have 1080 VA, not 900. 4. Panel schedules indicate that certain circuits are counted as having 125% demand for continuous load. Yet no circuits are identified as such. Please account for continuous loading on panels, and add 25% for the highest motor. 5. Please add a load calculation for the capacity of the service. 6. It appears that Phase B of Panel A is 17535 VA, not 16,535. |
08/18/2004 | DAN CASTRO | ZONING | REVIEW | Approved | |
08/19/2004 | LLESNY1 | WWM | REVIEW | Passed | |
08/19/2004 | LLESNY1 | WATER | REVIEW | Passed |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
08/19/2004 | LISA LESNY | OUT TO CUSTOMER | Completed |