Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T04CM03565
Parcel: 117141070

Address:
58 W CUSHING ST

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T04CM03565
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/03/2004 BLANCA ESPINO ENGINEERING REVIEW Approved
08/03/2004 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Revise the plumbing fixture schedule to comply with Tables 6-3 and 7-3, UPC 1994.
2. Provide riser diagrams for the waste & vent system and the water supply system.
3. Provide a duplex sump pump system for the sinks not using gravity waste. Reference Section 710.9, UPC 1994.
4. Provide cleanouts as required by Section 707.4 and 707.5, UPC 1994.
5. Show the location and sizes of the water meter and backflow preventer and the size and route of the water supply to the building.
6. Show how the water piping was sized. Reference Section 610.0, UPC 1994.
7. Show the route of the building sewer and the location of any required or existing cleanouts.
08/03/2004 LINDA BUCZYNSKI ELECTRICAL-COMMERCIAL REVIEW Denied T04CM03565 DENIED 8/3/04

1. Change note from "NEC 1999" to read NEC "2002".
2. Add a note to read: "Wiring in patient-care areas, whether new or existing, shall comply with NEC 517-13."
3. Provide fa fixture schedule/cut sheets for all lighting fixtures. Indicate voltage, phase, and maximum volt-amperes. This will enable review of branch circuits, feeder, and service.
4. Specify power requirements for new water heater.
08/03/2004 ROBERT SHERRY WATER REVIEW Approved
08/03/2004 DAN CASTRO ZONING REVIEW Approved
08/03/2004 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Provide ventilation calculations. Reference Section 401, IMC 2000.
2. Revise the exhaust or supply flow rates in the restrooms to comply with Section 403.3, IMC 2000.
3. Show the size, route, and termination of the condensate drains.
08/11/2004 CHRISTY FOREMAN BUILDING-COMMERCIAL REVIEW Needs Review
08/11/2004 EGRANT1 WWM REVIEW Needs Review
08/11/2004 EGRANT1 FIRE REVIEW Needs Review