Review Date Reviewer's Name Type of Review Description Status Comments
10/25/2004 JIM EGAN FIRE REVIEW Approved
10/25/2004 BLANCA ESPINO ENGINEERING REVIEW Denied A stamped approved Site Plan required prior to approval.
11/02/2004 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Provide a design for the water supply to the project including water supply isometrics. Reference Sections 610.1 and 610.4, UPC 1994.
2. Modify the site drawing to show the size, material, and route of the building water supply along with the location and size of the water meter. Reference Section 103.2.3, UPC 1994.
3. Modify the site drawing to show the size, route, material and slope of the building drain. Reference Section 103.2.3, UPC 1994.
4. Provide waste and vent riser diagrams (complete with all pipe sizes) for the project.
5. Show that the plumbing vents comply with Sections 901.0, 904.0, and 906.0, UPC 1994.
6. Provide cleanouts in the building sewer at intervals not exceeding 100 feet. Reference Section 719.1, UPC 1994.
7. Provide fixture descriptions for all plumbing fixtures. Reference Section 103.2.3, UPC 1994.
8. Provide equipment data for the water heater. Reference Section 103.2.3, UPC 1994.
9. If the specified water heater is not supplied with integral heat traps, provide heat traps on the supply and discharge piping. Reference Section 804.4, IECC 2000.
10. Provide ½" insulation on the first eight feet of supply and discharge piping for the water heater. Reference Section 804.5, IECC 2000.
11. Specify the material to be used for the gas piping.
11/02/2004 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Indicate on the drawings a maximum acceptable U-factor for the windows that corresponds to the provided energy calculations.
2. Show how the existing apartment complies with Section 309.1, IMC 2000.
3. Clarify how the outside air duct (HVAC Keynote #3) can terminate 10 feet from the flue from the water heater and furnace.
4. Provide calculations to show that the sizes of the individual flues and the common flue are correctly sized.
5. Show the size, routing, and termination of the condensate drains. Reference Sections 307.2.1 and 307.2.2, IMC 2000.
6. Provide exhaust for the bathrooms. Reference Section 403.3 IMC 2000.
11/02/2004 Robert Sherry WATER REVIEW Passed
11/05/2004 Linda Buczynski ELECTRICAL-COMMERCIAL REVIEW Denied TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL.

PLEASE CALL AT 791-5550 X1106 OR EMAIL AT Linda.Buczynski@tucsonaz.gov
IF YOU CARE TO DISCUSS.

1. Minimum font size is 10 point.
2. Provide Ground-Fault Circuit Interrupter Protection for bathroom, exterior and countertop receptacles. Reference NEC 210.8.
3. Provide Arc-Fault Circuit Interrupter Protection for all branch circuits supplying 15- and 20-ampere bedroom outlets. Reference NEC 210.12.
4. Exterior receptacles shall be listed for their application, installed at a wet location.
5. Show location of all panels.
6. Show location of service equipment.
7. Provide lighting fixture schedule and cut sheets. See attached Electrical Permitting Requirements.
8. Please provide receptacles in such quantity and configuration that achieves adherence to NEC 210.52. Living Rooms do not appear to comply.
9. Kitchen counters appear to need more receptacle(s). Reference NEC 210.52 (C) (1).
10. There is a receptacle located about 3' east of Apartment #2 Bathroom Wall. It does not appear to be installed in any structure. Please clarify.
11. Show Kitchen Exhaust Fan on Electrical Plans. Show Disconnect, Panel and Circuit Number, and account for in load calculations.
12. Label location of AC-1 and AC-2 on Electrical Plans. Show Disconnect per NEC 430 Part IX, and Panel and Circuit Number.
13. Lighting fixtures are on Circuits 2L4, 2L6, L4, and L6. No such panels indicated.
14. Specify the Grounding Electrode(s).
15. Provide TEP Available fault current, fault calculations, and AFC at equipment.
11/23/2004 Gerry Koziol WWM REVIEW Approved
11/24/2004 DAVID RIVERA ZONING REVIEW Denied November 24, 2004

Development Services Department
Zoning Review Section

David Rivera
Senior Planner

Comments

1. Zoning has reviewd the building plans but cannot approve plans until the site plan has been approved. Also it appears that an LDO will be required for the east and west building setbacks. Please insure that the LDO is approved or the building heights must be revised to comply with the required building setbacks.
12/08/2004 Raul Palma BUILDING-COMMERCIAL REVIEW Denied City of Tucson, Development Services
BUILDING AND STRUCTURAL COMMENTS

1) Include the existing building in the lateral design for wind and seismic, if structure
is physically attached to the new structure. If not physically attached then existing
structure does not have to be included in the lateral design.
2) Provide a footing design.
3) Sheets 4 and 5 of calcs shows the lateral load as 15 psf but on sheet 3 it is shown as
16.5 psf. Also, the STRUCTURE DESIGN CRITERIA sheet shows it as 16.5psf.
CLARIFY!
4) Sheet 7 of calcs, specify the size of bolts, lumber grade and species, size of ledger
and perpendiculer or parallel to the grain, specify the value used.
5) Sheet 8 of calcs, where was the value of 1330 obtained? Provide reference.
6) Provide smoke detectors in sleeping rooms.
7) State on plans"window sill shall be limited to a max of 44 inches from the finished
Floor."

Final Status

Task End Date Reviewer's Name Type of Review Description
02/07/2005 CINDY AGUILAR OUT TO CUSTOMER Completed
02/07/2005 ANGIE SHOFFSTALL REJECT SHELF Completed