Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T04CM02834
Parcel: 10309074A

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T04CM02834
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/25/2004 Jim Egan FIRE REVIEW Approved
06/29/2004 GERRY KOZIOL WWM REVIEW Approved
07/01/2004 Robert Sherry PLUMBING-COMMERCIAL REVIEW Denied 1. Provide site drawing showing the size and route of the building water supply along with the location and size of both the water meter and the reduced pressure backflow preventer assembly. Reference Section 103.2.3, UPC 1994.
2. Include all fixtures (including HVAC water connections) when calculating the total demand and determining pipe sizes. Reference Section 610.1, UPC 1994.
3. One of the specified fixtures (Bradley emergency shower) requires a minimum pressure greater than the 20-PSI used in the water pipe sizing calculations. Revise calculations as necessary. Reference Section 608.1, UPC 1994.
4. Revise the static lift shown in the water pressure calculations to correspond to the elevation difference between the meter and the highest fixture (H-2). Reference Section A3.2, UPC 1994.
5. Specify the type of backflow preventor to be installed before the fill for the evaporative cooler recirculation tank. Reference Section 103.2.3, UPC 1994.
6. Confirm the size of the floor sink accepting the drainage from the evaporative cooler pumping system and the pumped condensate from DXFC-1 and DXFC-2 is adequate. Reference Section 702.0, UPC 1994.
7. Provide upper terminal cleanouts for the urinals. Reference Section 707.4, UPC 1994.
8. Indirect waste receptors shall not be installed in a closet. Reference Section 804.1, UPC 1994.
9. Modify trap arm length for FS-1 to conform to Table 10-1, UPC 1994 with AZ State amendments.
10. Resize the section of natural gas pipe (over room 107) using Table 12-3, UPC or provide calculations demonstrating conformance to Section 1217.3, UPC 1994. Correct the total load on the section of natural gas pipe between the branches for RTU-5 and RTU-6 (Detail G-1/M2.2).
07/01/2004 ROBERT SHERRY WATER REVIEW Approved
07/01/2004 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Provide energy code compliance calculations. Reference Section 101.2, International Energy Conservation Code 1998.
2. Provide calculations to show that the common ventilation systems for RTU-3 and RTU-8 are sized in accordance with Section 403.3.2, IMC 2000.
3. Indicate on the drawing that all materials exposed in the return air plenum shall conform to Section 602.2.1, IMC.
4. Provide sufficient heat in the shop area to maintain a minimum temperature of 68°F on a design heating day (32°F). Reference Section 309.1, IMC 2000.
5. Show the sizes of the condensate drain piping. Provide calculations to show how the pipes were sized. Reference Section 307.2, IMC 2000 and Section 807.2, UPC 1994.
07/09/2004 Raul Palma BUILDING-COMMERCIAL REVIEW Approved
07/21/2004 BOB SUBA ELECTRICAL-COMMERCIAL REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
07/21/2004 CINDY AGUILAR OUT TO CUSTOMER Completed
07/21/2004 ANGIE SHOFFSTALL REJECT SHELF Completed