Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL NEW
Permit Number - T04CM02691
Review Name: COMMERCIAL NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/04/2004 | Christy Foreman | BUILDING-COMMERCIAL | REVIEW | Denied | CITY OF TUCSON DEVELOPMENT SERVICES STRUCTURAL REVIEW COMMENTS DATE: 8/6/04 ACTIVITY NUMBER: T04CM02691 PROJECT NAME: ACTIVITY BLDG. MILES EXPLORATORY SCHOOL PROJECT ADDRESS: 1400 E. BROADWAY BLVD. ARCHITECT / ENGINEER: CDG ARCHITECTS PROJECT REVIEWER: CHRISTY FOREMAN PHONE: 7901-5550 X1108 EMAIL: CFOREMA1@CI.TUCSON.AZ.US TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 791-5550 X1108 OR EMAIL AT CFOREMA1@CI.TUCSON.AZ.US IF YOU CARE TO DISCUSS. 1. Provide water closet stall for men's restroom, therefore allow both fixtures to be used with privacy. 2. 3 water closets required for women's restroom per code table 2902.1. 3. Clarify landing into bldg. - grade change? Clarify note 9 site plan / parking plan sht. 1.1. 4. Sht. 16.1 exit light over window instead of door. |
| 08/04/2004 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 08/04/2004 | Robert Sherry | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Revise the energy code calculations to match the proposed building. Provide sufficient information in the plans and specifications to demonstrate conformance to the energy conservation code. Reference Section 104.2, IECC 2000. 2. Indicate the minimum amount of outside air to be provided by the HVAC system and the amount of outside air to be delivered when the facility is fully occupied. Provide a sequence of operation to show how the CO2 sensors are to be used to control the amount of outside air delivered to the space. Reference Sections 403.3 and 405.1, IMC 2000. 3. Clarify the design of the exhaust system with respect to the number of inlets and the sequence of operation. Reference Section 106.3.1, IMC 2000. |
| 08/04/2004 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Show how the existing 6" sewer is to be relocated or otherwise accommodated with the proposed building that is being built directly over it. Reference Section 313.0, UPC 1994. 2. Provide the sizes of the scuppers shown on the plans. Provide overflow protection for the roof. Reference Appendix D, UPC 1994. 3. Revise the waste units for the mop basin in the fixture schedule (a 3" waste has 6 waste fixture units). Reference Table 7-3, UPC 1994. 4. Show the size and route of the water line serving the proposed building along with the size and location of the water meter and RPBP. Reference Section 610.0, UPC 1994. 5. Provide calculations to show how the water piping has been sized. Reference Section 610.5, UPC 1994. 6. Confirm that the wall-mounted water heater complies with the access requirements of Section 511.0, UPC 1994 with AZ State amendments. 7. Termination of the excess pressure relief from the water heater over a service sink is not approved location. Reference Section 608.5, UPC 1994. |
| 08/09/2004 | Gerry Koziol | WWM | REVIEW | Denied | NEED TO CLARIFY LOCATION/METHOD OF CONNECTION TO PUBLIC SEWER. |
| 08/15/2004 | BOB SUBA | ELECTRICAL-COMMERCIAL | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 08/17/2004 | DHERRON1 | OUT TO CUSTOMER | Completed |
| 08/17/2004 | SUE REEVES | REJECT SHELF | Completed |