Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL NEW
Permit Number - T04CM02690
Review Name: COMMERCIAL NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/29/2004 | LEE JACOBS | LANDFILL | REVIEW | Approved | This project is located approximately 1,500 feet away from the Tumamoc Landfill and is therefore exempt from the landfill ordinance. |
| 08/02/2004 | Robert Sherry | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Revise the energy code calculations to match the proposed building. Provide sufficient information in the plans and specifications to demonstrate conformance to the energy conservation code. Reference Section 104.2, IECC 2000. 2. Indicate the minimum amount of outside air to be provided by the HVAC system and the amount of outside air to be delivered when the facility is fully occupied. Provide a sequence of operation to show how the CO2 sensors are to be used to control the amount of outside air delivered to the space. Reference Sections 403.3 and 405.1, IMC 2000. 3. Clarify the design of the exhaust system with respect to the number of inlets and the sequence of operation. Reference Section 106.3.1, IMC 2000. |
| 08/03/2004 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 08/03/2004 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide the sizes of the scuppers shown on the plans. Provide overflow protection for the roof. Reference Appendix D, UPC 1994. 2. Revise the waste units for the mop basin in the fixture schedule (a 3" waste has 6 waste fixture units). Correct the arithmetic for the total of the water fixture units. 3. Show the size and route of the water line serving the proposed building along with the size and location of the water meter and RPBP. Reference Section 610.0, UPC 1994. 4. Provide calculations to show how the water piping has been sized. Reference Section 610.5, UPC 1994. 5. Confirm that the wall-mounted water heater complies with the access requirements of Section 511.0, UPC 1994 with AZ State amendments. 6. Termination of the excess pressure relief from the water heater over a service sink is not approved location. Reference Section 608.5, UPC 1994. |
| 08/09/2004 | Raul Palma | BUILDING-COMMERCIAL | REVIEW | Denied | City of Tucson, Development Services BUILDING AND STRUCTURAL COMMENTS 1) Provide a ramp at the 4" landing. 2) a. Provide a privacy stall for the men`s watercloset to separate the urinal and the watercloset. b. Provide 2 more waterclosets for the women`s restroom, urinal does not count in women`s restroom. 3) See lighting plan, sheet 16.1, exit sign is over window instead of door at opposite side. |
| 08/10/2004 | Gerry Koziol | WWM | REVIEW | Approved | |
| 08/18/2004 | Robert Suba | ELECTRICAL-COMMERCIAL | REVIEW | Denied | 1. provide the available fault current at service and at subpanel "A" and "MDP" . 2.Exit light location to be at the the exit. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 08/24/2004 | TAMI ACHONG | OUT TO CUSTOMER | Completed |
| 08/24/2004 | ANGIE SHOFFSTALL | REJECT SHELF | Completed |