Permit Number: T04CM02682
Parcel: 11714096A

Address:
460 S 6TH AV

Review Status: Completed

Review Details: COMMERCIAL NEW

Permit Number - T04CM02682
Review Name: COMMERCIAL NEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/24/2004 Jim Egan FIRE REVIEW Approved
06/28/2004 GERRY KOZIOL WWM REVIEW Denied NEED TO SHOW LOCATION/METHOD OF NEW CONNECTION TO PUBLIC SEWER-(6" PRIVATE SEWER NEEDS TO CONNECT TO A MANHOLE- EITHER NEW OR EXSISTING.)
NEED WASTEWATER DESIGN REVIEW OF LIFT STATION- ROBERT BUECHER 617-6206 @ 100 N STONE AV-4TH FL.
NEED WASTEWATER 8TH FL CREDIT EVALUATION. 740-6500
06/29/2004 Robert Sherry MECHANICAL-COMMERCIAL REVIEW Denied 1. Revise the dryer exhaust ducts to meet the requirements of Section 504.6.1, IMC 2000.
2. Provide detail to show how the secondary condensate drain is to function.
06/29/2004 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Revise the fixture schedule to include the floor drains. Reference Section 103.2.3, UPC 1994.
2. Indirect waste receptors shall not be installed in a cabinet or cupboard. Reference Section 804.1, UPC 1994.
3. Provide upper terminal cleanouts on horizontal drainage pipes exceeding 5 feet in length (drain lines serving sinks require cleanouts regardless of length) on the upper floor. Reference Section 707.4, UPC 1994 with State of Arizona amendments.
4. Include the separate dishwasher connection in the fixture unit calculations.
5. Provide the rim elevation of the next upstream sanitary manhole. Determine need for backwater valve per Section 710.1, UPC 1994.
6. Show how the rainwater is to be drained from patios 1305 and 1312. Reference Section 103.2.3, UPC 1994.
06/29/2004 ROBERT SHERRY WATER REVIEW Approved
06/30/2004 JIM TATE ENGINEERING REVIEW Denied A copy of the stamped approved site plan must be included in the submittal.
07/13/2004 DAN CASTRO ZONING REVIEW Denied Site plan approval required prior to Zoning review of structural plans.
07/13/2004 BOB SUBA ELECTRICAL-COMMERCIAL REVIEW Approved
07/26/2004 Raul Palma BUILDING-COMMERCIAL REVIEW Denied City of Tucson, Development Services
BUILDING AND STRUCTURAL COMMENTS

1) Re; the kitchen and loft, is there a separation between them? Being that the
typical unit floor plan shows a note stating all loft interior doors are AA. CLARIFY !
2) Specify size of all windows.
3) What is the opening in the wall at the bath room walls? Sheet M-A1.2.
4) Show connection details for guardrail for guardrails at stairway handrails.
5) Specify spacing of guardrail ballisters. 4" MAX
6) Provide handrail extentions(12" ) as per section 1003.3.3.11.5.

Final Status

Task End Date Reviewer's Name Type of Review Description
09/21/2004 BETH GRANT OUT TO CUSTOMER Completed
09/21/2004 ANGIE SHOFFSTALL REJECT SHELF Completed