Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T04CM02544
Parcel: 117040970

Address:
639 N 6TH AV

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T04CM02544
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/11/2004 BLANCA ESPINO ENGINEERING REVIEW Denied 1. Site Plan approval required.
06/15/2004 Robert Sherry PLUMBING-COMMERCIAL REVIEW Denied 1. Confirm that suspended water heaters comply with access requirements of section 511.0, UPC 1994 with AZ State amendments. (It is not shown on the architectural drawings.)
2. Clarify the scope of work for the second floor. Reference Section 103.2.3, UPC 1994.
06/15/2004 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Provide ventilation for rooms 105, 201, 202, 204, and 205. Reference Section 5:23-6.17(l), NJ Rehabilitation Subcode, 2000.
2. Revise the controls for the exhaust fans in rooms 109 and 110 to avoid recirculating air from restrooms. Reference Section 403.2.1, IMC 2000.
3. Revise the termination points of exhaust fans EF-1, EF-2, and EF-3 to avoid discharging the exhaust over a walkway. Reference Section 401.5.2, IMC 2000.
06/15/2004 ROBERT SHERRY WATER REVIEW Approved
06/21/2004 Martin Haeberle BUILDING-COMMERCIAL REVIEW Approved
06/22/2004 GERRY KOZIOL WWM REVIEW Denied Needs WW credit evaluation.
07/01/2004 Linda Buczynski ELECTRICAL-COMMERCIAL REVIEW Denied TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL.

PLEASE CALL AT 791-5550 X1106 OR EMAIL AT LBUCZYN1@CI.TUCSON.AZ.US
IF YOU CARE TO DISCUSS.

1. Please verify whether there will be any contact with electrical equipment in the course of the message therapy instruction. If so, please add the following note in a prominent place on the drawings: "All work in patient care areas shall comply with the requirements of NEC 517-13."
2. Provide the power requirements for the Fan w/Incandescent Fixture.
3. Two fans on the east side of the work are listed as being powered by Ckt 21, but the conduit run specifies Panel LP-1, Ckt 17. Please clarify this, and make any necessary changes to the panel schedule.
07/02/2004 DAVID RIVERA ZONING REVIEW Denied July 2, 2004

Development Services Department
Zoning Review Section

David Rivera
Senior Planner

Comments:

5. Zoning will review and approve the building plans once the structural and commercial reviewers have approved the building plans and the site plan has been approved.

Two approved and stamped copies of the approved site plan, landscape and NNPO plans must be included with the building plans.

Final Status

Task End Date Reviewer's Name Type of Review Description
07/15/2004 BETH GRANT OUT TO CUSTOMER Completed
07/15/2004 SUE REEVES REJECT SHELF Completed