| 05/25/2004 | JIM EGAN | FIRE | REVIEW | Approved | |
| 05/25/2004 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Coordinate the water pipe sizes as shown on sheets P-1 (1-1/4" main) and P-2 (1-1/2" main). 2. Revise the water pressure calculations to include the pressure drops for the meter and the backflow preventer. 3. Correct the fixture unit calculations. 4. Clarify the direction of flow and the pipe sizing for the hot water. Show how the hot water recirculation is to function. 6. Provide insulation for the hot water piping. 7. Indicate the termination of the 4" waste line on the exterior of the building. |
| 05/25/2004 | PETER MCLAUGHLIN | ZONING | REVIEW | Approved | |
| 05/25/2004 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 05/25/2004 | PATRICIA GILBERT | ENGINEERING | REVIEW | Approved | |
| 05/25/2004 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Provide energy code calculations. |
| 05/26/2004 | RAUL PALMA | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 05/26/2004 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Needs Review | |
| 05/27/2004 | LLESNY1 | WWM | REVIEW | Needs Review |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 05/27/2004 | LISA LESNY | OUT TO CUSTOMER | Completed |