Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T04CM02088
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/19/2004 | Robert Sherry | PLUMBING-COMMERCIAL | REVIEW | Passed | |
05/19/2004 | ROBERT SHERRY | WATER | REVIEW | Approved | |
05/20/2004 | Robert Sherry | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide a means to drain the chilled water piping. Reference Section 1206.2, IMC 2000. 2. Provide freeze protection for the new makeup water pipe. Reference Section 313.6, UPC 1994. |
05/24/2004 | JIM EGAN | FIRE | REVIEW | Approved | |
06/08/2004 | Linda Buczynski | ELECTRICAL-COMMERCIAL | REVIEW | Denied | TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 791-5550 X1106 OR EMAIL AT LBUCZYN1@CI.TUCSON.AZ.US IF YOU CARE TO DISCUSS. 1. Since McQuay is specified in Division 15 an acceptable Chiller manufacturer, please verify that such equipment can withstand the available fault current at its terminals. It appears that there are over 10,000 AFC at the controller, and the latest information we have is that the McQuay chillers can not withstand greater than 5000 AFC. 2. Since the conduit from MCC to New Panel C is to be run through the roof truss system, and since the area is Class 1 Division 2 up to the roof, it appears that the wiring method and conduit seals should be specified to comply with NEC 501-4 (b) and 501-5. 3. The Heat Transfer Skid area has not been identified as a Classified location. However, such items as the CNG Pressure Transmitters, Pressure Switches, Level Switches, and Flow Switches are specified in Division 15 as meeting Class 1 Division 1 Group D requirements. Please verify whether the skid area needs classification itself, possibly Division 2 according to NEC 501(b), and whether the installation for Panel C, Circuit C-2,4,6, or any of the wiring associated with the PLC or the skid electrical equipment would be affected. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
06/10/2004 | ANGIE SHOFFSTALL | APPROVAL SHELF | Completed |
06/10/2004 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |