Permit Review Detail
Review Status: Completed
Review Details: RESIDENTIAL BLDG/WWM
Permit Number - T04CM01537
Review Name: RESIDENTIAL BLDG/WWM
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/21/2004 | MELISSA POULIN | WWM | REVIEW | Approved | |
| 08/13/2004 | Neil Saunders | BUILDING-RESIDENTIAL | REVIEW | Denied | Plan Check Comments - T04CM00576 Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. In order to facilitate a shorter back check time, we request that you please provide revised plans and calculations, highlighting any changes, along with a written response to each of the noted items indicating action taken. General Requirements 1. All corrections and revisions shall be made on the original tracings and two new sets of prints shall be returned. 2. Pen or pencil corrections on final prints will not be acceptable. To avoid delays ensure all corrections have been made, are complete and have been coordinated on all-applicable details and notes. Foundation Plan 1. Post footing at front porch. Should this be detail 14/D1? Site Plan 1. Show gas lines, sewer lines and electric lines on property and where each enters the house. Floor Plan 1. Provide window size in existing master bedroom. Egress issue is pending. 2. Note that bathtub and shower enclosures shall be finished per P2710 with ceramic tile, or a listed enclosure, to a height of 72" above the drain per R702.4 and R307.2. 3. Note and specify that shower enclosures shall have a minimum finished interior area of 1,024 square inches and shall be capable of encompassing a minimum 30" circle per UPC SEC. 410.0. All glass enclosures shall be tempered. 4. Detail and specify stair rise and run (minimum 10" tread depth and 7 ¾" maximum riser height per R314). 5. Are water heater notes in garage misplaced? Structural Plan 1. Detail 5 & 6; Provide 3x ledger at existing masonry wall. Provide epoxy anchor spacing. 2. Provide special inspection form for epoxy bolts prior to pulling permit. 3. AB66 has no uplift value. Choose a post baser with uplift. 4. Detail 4/D1 is incorrectly cross-referenced. Plumbing, Mechanical and Electrical Plans 1. Provide total supply fixture unit calculation for entire house. Provide developed length of water supply. 2. Note on plan compliance with the water conservation requirements. Water closets, 1.6 gallons per flush, sinks and showerheads, 3 gallons per minute. 3. Note on plans: Mechanical shall comply with 2000 IRC chapters 18- 24. 4. Note on plan that all electrical work shall comply with 2000 IRC chapters 33 - 42. 5. Where ceiling fans are shown on the plans, provide a note indicating only approved outlet boxes shall be used, per E4001.6. 6. Show locations of smoke detectors per R317. Note that all smoke detectors must be interconnected with a power source from the building wiring, and shall be equipped with battery backup. When ceiling finish materials are removed, existing bedrooms shall be in compliance. When ceiling finish materials are not removed, existing bedrooms shall be equipped with battery operated smoke detectors per R317.1.1. If you have any questions, please contact your assigned plans examiner Neil Saunders at 791-5550, extension 1113. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 08/23/2004 | BETH GRANT | OUT TO CUSTOMER | Completed |
| 08/23/2004 | SUE REEVES | REJECT SHELF | Completed |