Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/26/2004 | JIM EGAN | FIRE | REVIEW | Approved | |
03/26/2004 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Resolve how the DWV (detail 3/P1) is to be handled in this project: sump pump or direct connection? 2. If the sump pump is to be used, how is it to connect to the sewer system? 3. What is the termination point of the T&P relief from the water heater? A floor drain is not approved for this purpose unless it has a funnel to prevent splashing. 4. Clarify what equipment is new and what is existing. |
03/26/2004 | RAUL PALMA | BUILDING-COMMERCIAL | REVIEW | Denied | |
03/26/2004 | ROBERT SHERRY | WATER | REVIEW | Approved | |
03/26/2004 | MICHAEL ST. PAUL | ZONING | REVIEW | Approved | |
03/26/2004 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Approved | |
03/26/2004 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T04CM01415 DENIED 3/26/04 1. provide disconnect for WH per NEC 422 Part C. 2. Provide conduit and conductor size for LPL feeder and TPL secondary. 3. Locate all equipment in plan view, such as TPL, SPL, and the existing panel feeding TPL. 4. It appears that equipment TPL on the Enclosed Circuit Breaker Schedule should read "SPL". Please clarify. 5. Provide load calculations for the panel feeding TPL, and that of the service, as necessary. |
03/26/2004 | PATRICIA GILBERT | ENGINEERING | REVIEW | Approved | |
04/21/2004 | GERRY KOZIOL | WWM | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
04/21/2004 | TAMI ACHONG | OUT TO CUSTOMER | Completed |