Permit Number: T04CM00964
Parcel: 13419042C

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T04CM00964
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/03/2004 Robert Sherry PLUMBING-COMMERCIAL REVIEW Denied 1. Provide calculations showing the water supply piping is sized in accordance with Section 610.4, UPC 1994. Include all fixtures when calculating the total demand and determining pipe sizes. Reference Section 610.1, UPC 1994.
2. Termination of the excess pressure relief from the water heater over a service sink is not approved location. Reference Section 608.5, UPC 1994.
3. Provide trap size of the floor drain, FD-1. Reference Section 103.2.3, UPC 1994.
4. Provide water supply isometrics. Reference Section 103.2.3, UPC 1994.
5. Provide natural gas pipe sizing calculations. Include developed pipe lengths on plans. Reference Section 1217.0, UPC 1994.
03/03/2004 ROBERT SHERRY WATER REVIEW Approved
03/03/2004 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Provide calculations demonstrating adequate ventilation. Reference Section 401, IMC 2000.
2. The air being transferred from the sales floor to rooms 105, 115, and 116 is in conflict with the requirements of Section 403.2.1, IMC 2000; provide the minimum ventilation for rooms 105, 115, and 116 as required by Section 403.3, IMC 2000.
03/08/2004 JIM EGAN FIRE REVIEW Approved
03/22/2004 Linda Buczynski ELECTRICAL-COMMERCIAL REVIEW Denied TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL.

PLEASE CALL AT 791-5550 X1106 OR EMAIL AT LBUCZYN1@CI.TUCSON.AZ.US
IF YOU CARE TO DISCUSS.

GLOBAL
1. Minimum font size is 10 point. Please resize and reprint.

Sheet E0.0
1. Add loads for any other existing occupancies which may be on the same service. Otherwise disregard.
2. Conduit 18, since it parallels (2) 3/0, would be read as "Greater than 3/0" on Table 250-66. Size of Gnd should be #2, not #3. Note that each Gnd shall be sized for the TOTAL cross-sectional area of the paralleled conductors.

Sheet E0.1
1. There are 14 receptacles on Ckt 74 Power Plan, but panel schedule only accounts for 6. Note that this also overloads the circuit at 21 A.
2. Ckt 66 on panel schedule accounts for 5 rooftop receptacles. There appear to be 9 on this project.
3. Ckt 54, which has (2) EF-2, shall have double the VA count.
4. Provide a mounting detail for the 112.5 KVA X'FMR, including dimensions and total weight of the equipment, attachment, and any other information required by the Building Plans Examiner.
5. Clarify which Ckt Sump Pump (Keynote 23) is on.
6. Ckt 19 apparently needs a 20/1 CB.
7. Lettering "CHECKOUT" and "CUSTOMER SERVICE" is upside down.
8. Provide a cut-sheet for Panel P1, which includes its listing. It appears to violate NEC 384-15 in having more than 42 OC devices.
9. Grounding of the 112.5KVA X'FMR as a derived system shall be on the secondary, not the primary.
10. Panel schedules refer to One-Line Diagram for fault current rating. One-Line does not indicate this for Panels M1, P1, or H1.
11. Fault calculations are based on 60,200 AFC from Tucson Electric Power. Note One states that there 13,540A available from the utility. Please clarify.
12. According to TEP's Electric Service Requirements, 2002 Edition, AFC for a 1000A 277/480V service from a pad-mounted transformer is only 32,600A. If this is the case, it may explain the 35,000A rating of the MDP. Please clarify.
13. On Short Circuit Schedule, the Length from the CT Cabinet to the MDP is listed as 140 LF. According to the scaled drawing this length appears to be approximately 65 LF.
03/23/2004 Paul Machado ENGINEERING REVIEW Approved
03/25/2004 Raul Palma BUILDING-COMMERCIAL REVIEW Denied City of Tucson, Development Services
BUILDING AND STRUCTURAL COMMENTS


1) Engineering calc`s are required for shelving or racks over 8 feet high.
a. Show all connection details and structural members.
03/26/2004 DAVID RIVERA ZONING REVIEW Denied Zoning will review and approve the building plans upon final approval by the building reviewers
03/29/2004 GERRY KOZIOL WWM REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
04/14/2004 LISA LESNY OUT TO CUSTOMER Completed
03/29/2004 ANGIE SHOFFSTALL REJECT SHELF Completed