Permit Review Detail
Review Status: Completed
Review Details: OTHER
Permit Number - T04CM00762
Review Name: OTHER
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/16/2004 | Neil Saunders | BUILDING-RESIDENTIAL | REVIEW | Denied | Plan Check Comments - Project T04CM00762 Plan Review for the above referenced structure has been completed. This letter reflects comments to be addressed. In order to facilitate a shorter back check time, we request that you please provide revised plans and calculations, highlighting any changes, along with a written response to each of the noted items indicating action taken. General Requirements 1. All corrections and revisions shall be made on the original tracings and two new sets of prints or (1) sepia and (1) blue line shall be returned. 2. Pen or pencil corrections on final prints will not be acceptable. To avoid delays ensure that corrections have been made, are complete and have been coordinated on all-applicable details and notes. Site Plan 1. Indicate the location of water and electric lines on the property, and where they enter the building. Provide the location of the water meter. Foundation Plan 1. Note on the drawings the allowable soil bearing pressure used in the design of the footings, or state the assumed value of 1500 psf, per table R401.4.1. Floor Plan 1. Provide all window sizes and types, and designate the operable portion of each. 2. Show door swings. 3. Label all rooms and spaces. Also, label room adjacent carport enclosure in existing residence. 4. Note that shower enclosure shall have a minimum finished interior of 1024 square inches and shall be capable of encompassing a minimum 30" circle per UPC sec 410. All glass enclosures shall be tempered. 5. Note that shower enclosures shall be finished per P2710 with ceramic tile, or a listed enclosure, to a height of 72" above the drain per R702.4 and R307.2. Structural Plans 1. Show locations of shear panels per R602.10 unless new construction is fully sheathed. Note exterior sheathing on all pertinent details and plans. 2. Show header sizes for all new openings in load bearing walls and provide a lintel size in CMU wall for new door. 3. Provide blocking or a fascia board at the end of new roof over bathroom. 4. Provide connection details where the new roof and old roof come together. 5. Specify lumber grade and species. 6. Specify hanger types for joist connection to ledger. 7. Specify new roofing. 8. Provide and show H2.5 ties at east bathroom wall connection to rafters. 9. Provide blocking or a ledger for 2x6 ceiling joists. Elevations 1. Show how attic ventilation will be achieved in compliance with R806.2. Note location of all vents needed to comply. Plumbing Notes 1. Waste pipes cannot lie under the footings as shown in plan view. Revise. 2. Provide a fixture unit calculation per using 6-3, 1994 UPC. Include all fixtures (new and existing), pipe size from meter to house and meter size. Mechanical Plan 1. Provide duct and register sizes. 2. Provide return air duct. 3. Provide specifications for heat pump. Is this unit electric or gas? If gas provide specs for btu demand, pipe size and distance from meter to all gas fired units. If electric, provide amperage and cross reference with panel schedule. 4. Note on plans: Mechanical work shall comply with chapters 12-16 and 18-24 2000 IRC. Electrical Plan 1. Provide a receptacle within 6' west of new 48" door opening in existing CMU wall. 2. If the new space is a habitable space then a smoke detector will required in the room as well as in the existing adjacent room. Note that all smoke detectors must be interconnected with a power source from the building wiring, and shall be equipped with battery backup. 3. Provide a switch controlled outside light at exterior door. 4. Provide a switched receptacle or switch-controlled light at entrance to room from existing residence. 5. Provide panel schedule showing circuit ampacity, wire sizes, panel size and circuit numbers. 6. Designate each switch, light, receptacle and electrical apparatus (i.e. disconnect) with a circuit number that is cross-referenced to the panel schedule. 7. Electrical load calculations are required with more than four additional circuits. 8. Note on plans: Electrical work shall comply with chapters 33-42, 2000 IRC. 9. Heat pumps are usually not 'switched' as shown. A thermostat is typical and is not required to be shown. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 03/18/2004 | LISA LESNY | OUT TO CUSTOMER | Completed |
| 03/17/2004 | ANGIE SHOFFSTALL | REJECT SHELF | Completed |