| 02/18/2004 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T04CM00741 DENIED 2/18/04 1. Plans shall be sealed by a Registrant in the State of Arizona. 2. Show TEP available fault current. 3. Show fault calculations for all critical parts of the system. 4. Show fault current rating for all critical pieces of equipment. 5. Show the grounding electrode system per NEC Article 250, and show sizing of all components. 6. Specify the conduit size to Panel LP2. 7. Specify feeder and conduit size to Panel LP1. 8. Show the connection to the grounding electrode at Panel LP2, per NEC 250-32 (a). 9. At Panel LP2, demonstrate compliance with NEC 250-43 (b). 10. Provide disconnecting means at Panel LP2 per NEC 225-31 and 225-32. 11. Coordinate with Mechanical Sheet M-2. On this Sheet, both AC-1 has compressor RLA at 17.9A. Electrical has compressor FLA at 28.6A. Check IFM as well. 12. Multiply lighting loads by 1.25 as continuous loads. 13. Add external lighting to load calculations. 14. Provide lighting fixture schedules, including maximum loading, voltage, and light distribution for exterior fixtures. 15. Tanning room appears to have 8 receptacles as opposed to 7. 16. There is an uncounted quad receptacle (CKT 23) in the beauty salon. |
| 02/18/2004 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Revise water fixture units for clothes washer to conform to table 6-3 (Public), UPC 1994. 2. Revise water pipe sizes based on Section 610.4, UPC 1994. |
| 02/18/2004 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Revise ventilation calculations, using the occupant loading from Table 403.3, IMC 2000. |
| 03/18/2004 | TACHONG1 | FIRE | REVIEW | Needs Review | |
| 03/18/2004 | TACHONG1 | WWM | REVIEW | Needs Review | |
| 03/18/2004 | TACHONG1 | BUILDING-COMMERCIAL | REVIEW | Needs Review | |
| 03/18/2004 | TACHONG1 | WATER | REVIEW | Needs Review | |
| 03/18/2004 | TACHONG1 | ZONING | REVIEW | Needs Review | |
| 03/18/2004 | TACHONG1 | ENGINEERING | REVIEW | Needs Review |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 03/18/2004 | TAMI ACHONG | OUT TO CUSTOMER | Completed |