Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T04CM00658
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/28/2004 | RAUL PALMA | BUILDING-COMMERCIAL | REVIEW | Denied | 04/28/04 1) Deferred submittals shall have prior approval from the building official. Provide a letter to request approval of the deferred submittal(s). Section 106.3.4.2 2) Regarding sprayed fire resistence to steel colmuns and beams. Determine the thickness of protection on those elements as specified in sections 720.5.1.3,720.5.2.1, and 720.5.2.3. |
05/03/2004 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide detail showing how the hydronic and other piping is to be supported from the structure (i.e. the connection to the building structure). |
05/03/2004 | Robert Sherry | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Coordinate detail 9/M8.1 with the water piping floor plan (the reduced pressure backflow preventers in room 323). 2. Provide manufacturer and model number for the "in-line vacuum breaker" and show how it is to be installed. |
05/06/2004 | ASHOFFS1 | ZONING | REVIEW | Needs Review | |
05/06/2004 | ASHOFFS1 | ELECTRICAL-COMMERCIAL | REVIEW | Needs Review |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
05/06/2004 | ANGIE SHOFFSTALL | OUT TO CUSTOMER | Completed |