Permit Review Detail
Review Status: Completed
Review Details: RESIDENTIAL BLDG/WWM
Permit Number - T04CM00654
Review Name: RESIDENTIAL BLDG/WWM
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/10/2004 | Neil Saunders | BUILDING-RESIDENTIAL | REVIEW | Denied | Plan Check Comments - T04CM00654 Plan Review for the above referenced structure has been completed. This letter reflects comments to be addressed. In order to facilitate a shorter back check time, we request that you please provide revised plans and calculations, highlighting any changes, along with a written response to each of the noted items indicating action taken. General Requirements 1. All corrections and revisions shall be made on the original tracings and two new sets of prints or (1) sepia & (1) blue line shall be returned along with all redline prints. 2. Pen or pencil corrections on final prints will not be acceptable. To avoid delays ensure all corrections have been made, are complete and have been coordinated on all-applicable details and notes. Floor Plans 1. Provide all window sizes and types, and designate the operable portion of windows, as well as the locations of tempered glass per R308.4. Review requirements of this section and review 'hazardous locations' on plan to comply. Windows E, G, C, F and The fixed part of A. 2. Note that bathtub and shower enclosures shall be finished per P2710 with ceramic tile, or a listed enclosure, to a height of 72" above the drain per R702.4 and R307.2 3. Note and specify that shower enclosures have a minimum finished interior of 1024 square inches and shall be capable of encompassing a minimum 30" circle per UPC sec 410. 4. Identify ceiling heights on all areas of the floor plan. If sloped ceiling, note average height. Structural Plans 1. Special inspection required for epoxy bolts. Submit form 2. Beam B2 is callout on the plan as a 6x12, and in the calcs (pg A7) as a 6x12. Clarify. 3. Are all posts the same size? Page 02- Note 19 - Structural post 6x6. Is this typical of all posts? 4. Specify lintel over B windows in rammed earth wall. 5. Page 13: All welded post caps, cross brace connections, anchor panel, etc require justification (i.e. engineering) to support lateral load imposed in ¾" rods. 6. How is 1" steel tube, above HVAC vent, connected to 6x12 beams. 7. Provide a description of the Cistern frame. Is the deck above designed to hold people? If so, provide a way to get to the deck as well as railings. Provide inputs and distinguish desired outputs of the Multiframe 4D model. What type of load(s) is the frame built to withstand? Plumbing Plans 1. Clean out should be 2-way. 2. The city of Tucson has not yet adopted the plumbing section of the IRC. The current code being used is the 1994 UPC with State amendments. Plans must reference this code. 3. Water line: Provide total (all structures on meter) fixture demand. Water line size is inadequate for fixture unit count of 11 per 1994 UPC table 6-3. ¾ " line at 250' is good or 9 fixture units. 4. Show water supply for bathtub. 5. Provide vent for tub and work sink - give pipe sizes. Mechanical Plans 1. Provide Mechanical Plan showing the following: 2. Give furnace specifications. 3. Gas Appliances shall comply with 1994 UPC and state amendments for combustion air requirements. Detail how. 4. Show where return air duct opens up at. 5. Provide clearer details of the duct work from the evap cooler into the house. Electrical Plans 1. All receptacles at counter top shall GFCI protected per E3802.7. 2. Panel schedule should be for the subpanel only. Current panel is confusing. Clarify 3. Note that all smoke detectors must be interconnected with a power source from the building wiring and shall be equipped with battery backup. 4. Subpanel must be located in a space 30"(clear to the floor) side to side with 3' clear space in front. ANY QUESTIONS PLEASE CONTACT NEIL SAUNDERS @ 791-5550 x2208 |
| 03/15/2004 | GERRY KOZIOL | WWM | REVIEW | Denied |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 03/16/2004 | TAMI ACHONG | OUT TO CUSTOMER | Completed |
| 03/15/2004 | SUE REEVES | REJECT SHELF | Completed |