Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T04CM00609
Parcel: 121110220

Review Status: Completed

Review Details: REVISION

Permit Number - T04CM00609
Review Name: REVISION
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/21/2004 Linda Buczynski ELECTRICAL-COMMERCIAL REVIEW Denied TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL.

PLEASE CALL AT 791-5550 X1106 OR EMAIL AT LBUCZYN1@CI.TUCSON.AZ.US
IF YOU CARE TO DISCUSS.

1. Please check the available fault current at CREP-2. It appears that distance from utility to MDP is aprox. 110 LF, and that distance from MDP to CREP-2 is aprox. 65 LF such that AFC at CREP-2 is 12,744A.
2. Pls check the Ground Fault and Short Circuit Protection for AC-3. A 40A CB would be oversized for a piece of equipment drawing less than 5 A. If the original disconnect is fused to the proper values, disregard.
3. On MDP, the loads for EDP should read 34,170, 34,270, and 24,775 for Phases A, B, and C respectively. Totaling the motors on this project appears to come to 115,905 VA; minus 18,630 for largest motor results in 97,275 for remaining motors, not 72,345. Pls clarify and carry through all calculations.
4. Please indicate all revisions on plans, including but not limited to: new location of CREP-2 on Sheet E1, addition of ground ring around ancillary building on Sheet E2, Notes 32, 39, 40, 60, and 61 on Sheet E2, new designation of EDP-1 on fault calculations on Sheet E3, Keynote 9 on Sheet E3, Notes 18 and 22 on Wiring Legend on Sheet E3, new EDP-1 designation on Panel Schedule MDP, addition of EDP-2 to Panel MDP, subsequent load tabulation changes on Panel MDP, removal of AC-3 from Panel NLP, subsequent load tabulation changes on Panel NLP, redesignation of EDP-1 on Panel Schedule EDP-1, relocation and recircuiting to double pole of CU-8 on Panel EDP-1, removal of AC-5, AC-2, CU-2, AC-4 & AC-7 from Panel Schedule EDP-1, subsequent load tabulation changes on Panel EDP-1.

Final Status

Task End Date Reviewer's Name Type of Review Description
09/24/2004 BETH GRANT OUT TO CUSTOMER Completed
09/24/2004 ANGIE SHOFFSTALL REJECT SHELF Completed