Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T04CM00609
Parcel: 121110220

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T04CM00609
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/09/2004 Doug Laakso BUILDING-COMMERCIAL REVIEW Denied .. T04CM00609 .. 4927 E SPEEDWAY BL .. DGL .. 3/9/04 ..
S1. Provide legal description : showing two lots ( parcel #121110230 and #121110220 ) are combined into a single parcel, as shown middle property line puts building into violation of the IBC and this permit cannot be issued.
S2. Clarify accessibility :
1. Show elevation changes by 'spot' finish grades on drawings.
2. Show conformance, with details, complying with ANSI A117.1-1998 ed at :
1. Parking space, Sec 502
2. Access aisle, Sec 503
3. Curb ramps, Sec 406.
S3. Explain prefabricated concrete building:
1. Occupancy - IBC Sec 3
2. Type of construction
3. Fully detial or shop drawings?
4. Area calculation
5. Ref note #1 on drawing #A1.
S4. Locate fence, note #18 on drawing #A1, with regard to property line detail 1/A1.
S5. Provide infill details, showing anchorage to existing, materials of construction and reinforcing of infill.
S6. Provide details of furr-out, including attachment to structure above and below, flame-spead and smoke-development of plastics, materials of construction, ref drawing #A2.
S7. Provide structural details at new door opening, showing reinforcing at jambs (stem to roof bond beam) and lintel (extending 24 inches beyond jambs).
S8. Provide structural calculations and details for vault including grating/explain and specify.
S9 Provide structural calculations and details for mounting condensing units on roof, ref drawing #M1.
Questions? Call Douglas Laakso, COT-DSD Structural Plans Examiner, 520 791-5550 x 1111.
03/10/2004 Robert Sherry MECHANICAL-COMMERCIAL REVIEW Denied 1. Coordinate location of fan coil unit FC-1 with the electrical equipment
2. Revise the design of the fuel return line to comply with the requirements of Section 1305.4, IMC 2000.
3. Coordinate the Fuel Tank Detail (sheet M2) with General Notes #4 and #6
4. Provide sequence of operation for the sump pump.
03/12/2004 JIM TATE ENGINEERING REVIEW Denied Site Plan approval required.
03/15/2004 Linda Buczynski ELECTRICAL-COMMERCIAL REVIEW Denied TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL.

PLEASE CALL AT 791-5550 X1106 OR EMAIL AT LBUCZYN1@CI.TUCSON.AZ.US
IF YOU CARE TO DISCUSS.

1. Please note that available fault current from the Tucson Electric Power Company, per its published standard, SR-510, is 75,100A for a 2000A, 120/208, pad-mount X'FMR service. If TEP has provided you with documentation that the AFC at this location will not exceed 36,300A, please state so on the plans. Otherwise, make corrections to fault current calculations and equipment ratings as appropriate.
2. Please provide the fuel type intended for use. Since the sump apparently needs an explosion-proof disconnect, it would follow that other Code-required provisions for the installation, such as conduit seal-offs, would also be called out on the plans. Please clarify, and revise the drawings as necessary.
03/16/2004 Joseph Linville ZONING REVIEW Denied Zoning will review and approve the building plans upon approval by the commenrcial reviewers.