Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T04CM00553
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/11/2004 | JIM EGAN | FIRE | REVIEW | Approved | |
| 05/13/2004 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Submit an appeal to the Building Official justifying the alternate calculations for the ventilation of the project space. Reference Section 105.2, IMC 2000. |
| 05/13/2004 | Robert Sherry | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Based on the recalculated pressure loss calculations, the branch piping sizes shown in detail 1/MP-1 appear to be undersized; revise as required. Reference Section A 6.1, UPC 1994. 2. Coordinate the size of the building water supply pipe shown on sheet 1 with the size shown on sheets 9 and 11. |
| 05/13/2004 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 05/13/2004 | GERRY KOZIOL | WWM | REVIEW | Approved | |
| 05/20/2004 | Raul Palma | BUILDING-COMMERCIAL | REVIEW | Denied | 1) Bathrooms--Provide 3 waterclosets for men and 6 water-closets for women. If waterclosets are provided in another building show them. 2) Specify and note on plans that areas above storage room and bathrooms will not be used for storage. Provide a sign stating "not a storage area " and locate in conspicuous location. 3) Specify solid blking behind grab bars atbath rooms. 4) Comply to comment #10 of previous comment dated 05/18/04. |
| 05/21/2004 | Paul Machado | ENGINEERING | REVIEW | Approved | |
| 06/01/2004 | PETER MCLAUGHLIN | ZONING | REVIEW | Approved | |
| 06/03/2004 | Linda Buczynski | ELECTRICAL-COMMERCIAL | REVIEW | Denied | TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 791-5550 X1106 OR EMAIL AT LBUCZYN1@CI.TUCSON.AZ.US IF YOU CARE TO DISCUSS. 1. Ckt A-1, with (14) (182W) fixtures, and the two exit lights, should have at least 2548 VA, not 1800. 2. Same as above for Ckt A-3. 3. Circuit 11 has exterior lights in plan view, but is spare on panel schedule. Please clarify. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 06/04/2004 | DELMA ROBEY | OUT TO CUSTOMER | Completed |