Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T04CM00537
Parcel: 140260430

Review Status: Completed

Review Details: 3RD PARTY REVIEW-COMMERCIAL TI

Permit Number - T04CM00537
Review Name: 3RD PARTY REVIEW-COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/23/2004 TACHONG1 WWM REVIEW Needs Review
03/23/2004 STANTEC 3RD PARTY REVIEW-COMMERCIAL REVIEW Denied Plan review for the above-referenced project has been completed, per the 2000 IBC and IMC, 1998 IECC and ICC/ANSI A117.1, 1999 NEC, with all local amendments and the 1994 UPC with Arizona State Amendments. This letter reflects comments to be addressed with a written response to each of the noted items indicating the action taken. In order to facilitate a shorter back-check time, we request that you please provide revised plans and calculations, highlighting any changes that have been made.

SCOPE OF REVIEW:

The scope of this review covers Architectural, Structural, Plumbing, Mechanical and Electrical. All features were checked only to the extent allowed by the submittal provided. All portions of the project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval.

GENERAL:

There are no general comments to be addressed.

ARCHITECTURAL:

There are no architectural comments to be addressed.

STRUCTURAL:

Provide the geotechnical report referenced in the structural calculations (Terracon Report No. 63995196 dated February 1, 2000). Does this report require engineered fill under foundations? If so then add a special inspection certificate for engineered fill to the list in the next comment. This previous comment has not been addressed. Please provide the report.

Provide City of Tucson special inspection certificate(s) for the following [and please make sure that the owner or their representative signs the certificate(s)]:
Concrete
Reinforcing Steel
Structural Steel
Field Welding
High Strength Bolts
Epoxy Anchors
This previous comment has not been addressed. The structure engineer's response letter, which was attached to the architect's response letter, requested that the architect please provide these certificates. Please, someone, provide the requested certificates.

MECHANICAL:

There are no mechanical comments to be addressed.

PLUMBING:

There are no plumbing comments to be addressed.

ELECTRICAL:

There are no electrical comments to be addressed.
03/23/2004 TACHONG1 WATER REVIEW Needs Review
03/23/2004 TACHONG1 FIRE REVIEW Needs Review

Final Status

Task End Date Reviewer's Name Type of Review Description
03/23/2004 TAMI ACHONG OUT TO CUSTOMER Completed