Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T04CM00262
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/16/2004 | Robert Sherry | PLUMBING-COMMERCIAL | REVIEW | Denied | Revise the gas piping. Based on the submitted loads and pipe lengths, the gas piping is undersized. Reference Section 1217.1, UPC 1994. |
| 04/16/2004 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Approved | |
| 04/16/2004 | JIM EGAN | FIRE | REVIEW | Approved | |
| 04/22/2004 | Doug Laakso | BUILDING-COMMERCIAL | REVIEW | Denied | .. T04CM00262 .. 926 W VIRGINIA ST .. DGL .. 4/23/04 .. .. 2nd Review .. (Prior comments .. dated 3/12/04) S1.See prior comment #S1, provide revision. Indicate number of occupants on drawings. S2.See prior comment #S2, provide revision. Indicate code analysis on drawings. S3.See prior comment #S5, provide revision. Address fire rating of exterior walls per IBC Sec 6, Table #601 and #602, show on drawings. S4.See prior comment #S6, provide revision. Detail fire-rated assembly per IBC Sec 7, including openings. S5.See prior comment #S7, provide revision. Clarify fire protection requirements per IBC Sec 9. S6.See prior comment #S8, provide revision. Clarify landings at five doors/doorways, to show compliance provide 'spot' elevations of finish grades, Per IBC Sec 1003.3.1, ref dwg #1,2 and 3. S7.See prior comment #S9, provide revision. Clarify door spacing, per IBC Sec 1003.3.1.7. S8.See prior comment #S10, provide revision. Show exit gate and new door requirements per IBC Sec #10 and 11, including ANSI A117.1-1998 ed. S9.See prior comment #S11, provide revision. Show new exit gate and new door comply with IBC Sec #10, 11 and ANSI A117.1-98ed. S10.See prior comment #S12, provide revision. Identify accessibile sleeping room and associated toilet and bathing facilities per IBC Sec 1107.5. S11.See prior comment #S13, provide revision. Provide flashing at details #4 and 5 on drawing #5, per IBC Sec 1507. S12.See prior comment #S14, provide revision. Fully detail skylight shown on drawing #3, per IBC Sec 2405 and 2606. S13.See prior comment #S15, provide revision. Clarify extent of plywood on walls, ref detail #1,2,3,and 6 on drawing #5. S14.See prior comment #S16, provide revision. Clarify seal (weather-resistance) at detail 2/5. S15.See prior comment #S17, provide revision. Fully specify Ramset and show required edge distance is complied with, ref 3/5. S16.See prior comment #S18, provide revision. Locate and detail on drawings hold-downs, ref schedule on drawing #5 and structural calculations, pg 6. Questions? Call Douglas Laakso, COT/DSD Structural Plans Examiner, at (520) 791 5550 x 1111. |
| 05/06/2004 | David Rivera | ZONING | REVIEW | Denied | May 6, 2004 David Rivera - Senior Planner Zoning Review Section This plan has been referred to Aline Torres at DSD, Rezoning Section for a Special Exception Type 5 review and approval. Zoning cannot approve the site or building plans until the Special Exception process has run its course and has been approved. Please feel free to call me if you have any questions. The building plans may be submitted for review with the understanding that the owner is aware that additional restrictions or conditions may be placed on this development through the Special Exception process and may require changes be made to the building plans. Once the Special Exception review and approval has been made, provide two copies of the approved special exception plans with the building plans on the next submittal. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 05/07/2004 | LISA LESNY | OUT TO CUSTOMER | Completed |
| 05/06/2004 | ANGIE SHOFFSTALL | REJECT SHELF | Completed |