Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T04CM00047
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/07/2004 | JIM EGAN | FIRE | REVIEW | Denied | Provide list of all hazardous materials in retail area and storage. List quantities for each. Provide MSDS for all hazardous materials. |
| 01/07/2004 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide riser diagram for water. 2. Provide water pressure calculations to show how the water piping was sized. Include existing fixtures (e.g. hose bibbs) in calculations. Provide sizes of the water meter and reduced pressure backflow preventer. 3. Revise fixture unit schedule using values from Tables 6-3 and 7-3, UPC 1994. 4. Resize gas lines branches to the rooftop units. 5. Correct connections of P-1 and P-4 on the riser diagram. 6. Provide service sink per chapter 29, IBC 2000. 7. Show elevation of finished floor and rim elevation of upstream manhole. |
| 01/07/2004 | MARTIN HAEBERLE | BUILDING-COMMERCIAL | REVIEW | Denied | |
| 01/07/2004 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 01/07/2004 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 01/07/2004 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide ventilation calculations per Section 403.3, IMC 2000. 2. Show air flow quantities for all diffusers. 3. Show exhaust flow rates for restrooms. (Minimum of 75 CFM per water closet or urinal) |
| 01/09/2004 | PATRICIA GEHLEN | ZONING | REVIEW | Approved | |
| 01/09/2004 | TACHONG1 | WWM | REVIEW | Needs Review | |
| 01/09/2004 | TACHONG1 | ENGINEERING | REVIEW | Needs Review |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 01/09/2004 | TAMI ACHONG | OUT TO CUSTOMER | Completed |