Permit Review Detail
Review Status: Completed
Review Details: 3RD PARTY REVIEW-COMMERCIAL
Permit Number - T04CM00036
Review Name: 3RD PARTY REVIEW-COMMERCIAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/18/2004 | EROSE1 | WWM | REVIEW | Needs Review | |
| 02/18/2004 | EROSE1 | ENGINEERING | REVIEW | Needs Review | |
| 02/18/2004 | GP | 3RD PARTY REVIEW-COMMERCIAL | REVIEW | Denied | ARCHITECTURAL COMMENTS Sheet A1 1. Door 110, proposed as an exit, may not terminate at a walled in patio. Please show provisions for egress path exiting to a public way. Ref. IBC 1003.2.2.10. If a gate is to be installed, include specifications in the door schedule that comply with IBC 1003.3.1.8. Comment restated. PLUMBING COMMENTS Sheet P1 1. Show CW to fixture P2 in Room 115. Sheet P2 1. Show HW to fixture P3 outside of Room 127. MECHANICAL COMMENTS-The mechanical portion has been reviewed and approved. ELECTRICAL COMMENTS - The electrical portion has been reviewed and approved. ENERGY COMMENTS - The energy portion has been reviewed and approved. |
| 02/18/2004 | EROSE1 | WATER | REVIEW | Needs Review | |
| 02/18/2004 | EROSE1 | FIRE | REVIEW | Needs Review |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 02/18/2004 | ELAINE ROSE | OUT TO CUSTOMER | Completed |