Permit Number: T04CM00010
Parcel: 13510150R

Review Status: Completed

Review Details: 3RD PARTY REVIEW-COMMERCIAL TI

Permit Number - T04CM00010
Review Name: 3RD PARTY REVIEW-COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/16/2004 EROSE1 WWM REVIEW Needs Review
01/16/2004 STANTEC 3RD PARTY REVIEW-COMMERCIAL REVIEW Denied SCOPE OF REVIEW:

The scope of this review covers Architectural, Structural, Plumbing, Mechanical and Electrical. All features were checked only to the extent allowed by the submittal provided. All portions of the project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval.

GENERAL:

q There are no general comments to be addressed.

ARCHITECTURAL:

q Elevation "R" on Sheet A6.0 indicates that the bottom of the water heater is to be at 9'-6" (while the ceiling above is at the same elevation). Please clarify. A permanent ladder access is required for any water heater mounted on a platform at 8'-0" or higher above the finish floor [1994 UPC Sec. 511.2].
STRUCTURAL:

q Sheet S0.1 indicates that special inspection is required for soils. Is this correct? Please clarify. If special inspection for soil is required then provide a special inspection certificate to cover this requirement.

q The left half of the lay out drawing on Page 3 of the structural calculations indicates that that a "B3 Sim" beam is to be used for the framing of this portion of the roof (indicated as a 3 1/8" x 15" glue laminated beam on Page 4 of the same calculations). Sheet S2.1 indicates that this member is a 3 1/8" by 10 1/2" glue laminated beam. Please clarify.

MECHANICAL:

q There are no mechanical comments to be addressed.

PLUMBING:

q There are no plumbing comments to be addressed.

ELECTRICAL:

q There are no electrical comments to be addressed.

-End of Review-
01/16/2004 EROSE1 WATER REVIEW Needs Review
01/16/2004 EROSE1 FIRE REVIEW Needs Review

Final Status

Task End Date Reviewer's Name Type of Review Description
01/16/2004 ELAINE ROSE OUT TO CUSTOMER Completed