Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T04BU03017
Parcel: 141148170

Review Status: Completed

Review Details: GRADING

Permit Number - T04BU03017
Review Name: GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/12/2005 PAUL MACHADO ENGINEERING REVIEW Denied To: Steve Gregor, P.E. DATE: January 12, 2005
Gregor and Grenier 5232 E. Pima Street, Ste. A
Tucson, Arizona 85712
SUBJECT: Retail Center Valencia/Nexus, Lot 3, McDonalds Restaurant
T04BU03017 (First Review)
T15S, R15E, Section 22

RESUBMITTAL REQUIRED: Grading Plan, Drainage Report and SWPPP

The Grading Plan (GP) and Drainage Report (DR) and SWPPP cannot be approved as submitted. Please address the following review comments prior to the next submittal.

Grading Plan:
1. Please include a response letter to the comments along with the corrected copies of the GP.
2. Submit the approved stamped Development plan with the re-submittal.
3. For future reference, (3) copies of the Grading plan are required for submittal.
· A copy of the GP for COT Records.
· A copy of the GP for the client.
· A copy of the GP to be attached to the SWPPP for the inspectors use.

If you have any questions, I can be reached at 791-5550 x1193 or Paul.Machado@tucsonaz.gov
Paul P. Machado
Senior Engineering Associate
City of Tucson/Development Services Department
201 N. Stone Avenue
P.O. Box 27210
Tucson, Arizona 85726-7210
(520) 791-5550 x1193 office
(520) 879-8010 fax
C:/9130 E. Valencia Road Grad
01/25/2005 David Rivera ZONING REVIEW Denied 01/25/05

Development Services Department
Zoning Review Section

David Rivera
Senior Planner

Comments

Comments:

1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed.

2. Zoning could not verify that the grading plan was in compliance with the approved site plan or development plan. Please submit two copies of the approved and stamped site/development, landscape, and NPPO plans with the next grading plan submittal.

3. Zoning will re-review the grading plan on the next submittal to insure compliance with the approved site/development plan. Additional comments may be forthcoming.

4. A site card with DSD approvals by Fire, Zoning, Handi-cap, Engineering, and Landscape/NPPO including the approved development plan stamped for site plan approval and signatures is required before the grading plan can be approved by Zoning. Two copies of the approved development plan, landscape and NPPO plans are to be submitted with the grading plans packet for processing and approval as a site plan. No fees are involved in re-stamping the development/tentative plat plans as an approved site plan. The development plan may be walked through for stamps and site card sign off. Submit the following: two copies of the stamped development plan, landscape and NPPO plans must be included with the grading plans packet processed together for site approval.
12/21/2004 Andrew Connor NPPO REVIEW Denied Submit approved development plan including landscape and approved revision plans to continue review.

Final Status

Task End Date Reviewer's Name Type of Review Description
01/26/2005 TAMI ACHONG OUT TO CUSTOMER Completed
01/26/2005 ANGIE SHOFFSTALL REJECT SHELF Completed