Permit Number: T04BU03004
Parcel: 13316027N

Address:
2050 N WILMOT RD

Review Status: Completed

Review Details: GRADING

Permit Number - T04BU03004
Review Name: GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/12/2005 LOREN MAKUS ENGINEERING REVIEW Denied DATE: January 12, 2005
TO: Steve Gregor, Gregor and Grenier Engineering
SUBJECT: La Paloma Charter School, Grading Plan Review
REVIEWER: Loren Makus
ACTIVITY NUMBERS: T04BU03004

SUMMARY: The Grading Plan and Drainage Report were reviewed by Development Services Department Engineering Division. The Grading Plan, Drainage Report and Stormwater Pollution Prevention Plan (SWPPP) were not approved at this time.
Grading Plan comments:
1. The Grading Plan cannot be approved until the Tentative Plat has been approved. Additional comments may be forthcoming after the Tentative Plat has been approved.
2. Provide pipe bollards or some other method for preventing unauthorized vehicle access through the two areas of depressed curbs along the south end of the PAAL.
3. Show and label grading limits.
4. Provide a diagram of the wall opening that accepts the discharge from the site on the north side of the project area. Show the location and size to demonstrate that it has the capacity to receive the discharge.
5. Revise the plans to show that the tops of the the cut slopes are at least two feet from the property line. (DS 11-01.9.2)
6. Revise the details of the entry sidewalk to provide a concrete surface or the equivalent as required by the Development Standard 2-08.5.1.C.
Stormwater Pollution Prevention Plan comments:
7. Part IV.C.2.e. Show the location of the Rose Hill Wash in the general location map.
8. Revise the description of the Post-Construction Controls on page 11 to be consistent with the rest of the project descriptions.

Revise the Site Plan, Grading Plan, Drainage Report and the SWPPP to address all of these comments and resubmit three copies of the grading plan and two copies of the SWPPP. If you would like to meet with me to discuss any of these comments please call me at (520) 791-5550 ext. 1161 or email me at loren.makus@tucsonaz.gov.

Loren Makus, E.I.T.
Senior Engineering Associate
Engineering Division
Development Services
01/25/2005 David Rivera ZONING REVIEW Denied 01/25/05

Development Services Department
Zoning Review Section

David Rivera
Senior Planner

Comments:

1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed.

2. Zoning could not verify that the grading plan was in compliance with the approved site plan or development plan. Please submit two copies of the approved and stamped site/development, landscape, and NPPO plans with the next grading plan submittal.

3. Zoning will re-review the grading plan on the next submittal to insure compliance with the approved site/development plan. Additional comments may be forthcoming.
12/20/2004 Andrew Connor NPPO REVIEW Denied Submit approved site and landscape plans to continue review.

Final Status

Task End Date Reviewer's Name Type of Review Description
01/26/2005 TAMI ACHONG OUT TO CUSTOMER Completed
01/26/2005 ANGIE SHOFFSTALL REJECT SHELF Completed