Permit Number - T04BU02978
Review Name: RESUBMITTAL - GRADING ALL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/16/2005 | DOUG WILLIAMS | ENGINEERING | REVIEW | Denied | SUBJECT: Montage Vista II - Lot 58 REVIEWER: Doug Williams DATE: 16 February 2005 ACTIVITY NUMBERS: T04BU02978 SUMMARY: Engineering Division has reviewed the grading plan resubmitted. All previous comments have not been fully addressed, and approval is not recommended at this time. Please address the comments below on revised plans. Resubmittal shall require a response letter and three sets of revised grading plans. 1. Please address the following in Section B-B (Sheet G/2): a) Depict a minimum 2' setback, dimensioned from the footer to the property line on the north perimeter, and from the top of cut (for the proposed interceptor swale) to the south property line, for the south perimeter (DS 11-01.7); b) provide swale dimensioning (preferably a detail for each), and depict the northern swale in plan view on sheet G1 with periodic spot elevations, or a high point (spot) elevation. Please refer to Development Standard 11-01.10.5 for interceptor swale (drain) construction requirements (south perimeter) and assure all necessary details and/or notes are provided in accordance with such. 2. Detail 3/G2: a) provide a dimension from the house wall to the HVAC unit, and from the unit to the top of swale, and show how the required screening (wall or landscaping) will be incorporated into this area; b) reflect geotechnical recommendation of September 17, 2004 by LMT Engineering, Inc. by providing a V-ditch at the bottom of this cut rather than only one slope with an apparent "daylight", or grade match on the north side of the swale; c) additional elevation information is needed in this area - specifically, depict proposed spot elevations for the HVAC unit pedestal and the invert and north top of the swale. 3. Include reference to sheet G2 in the detail 1 callout, at the driveway entrance on Sheet G1. Resubmittal shall include 3 sets of revised grading plans addressing all comments provided above. If you have any questions, I can be reached at 791-5550, ext.1189 or via email at Doug.williams@tucsonaz.gov Doug Williams Sr. Eng. Assoc. Engineering Division Development Services Department |
| 02/25/2005 | DAVID RIVERA | ZONING | REVIEW | Denied | 02/25/05 Development Services Department Zoning Review Section David Rivera Principal Planner Comments: 1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed. 2. If there is a mater grading plan that has been approved for the Phase II development please submit a copy of the plan. The plan should depict the approved grading limits or pad area. |