Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T04BU02933
Parcel: 12212075A

Review Status: Completed

Review Details: RESUBMITTAL - GRADING ALL

Permit Number - T04BU02933
Review Name: RESUBMITTAL - GRADING ALL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/04/2005 Loren Makus ENGINEERING REVIEW Denied For Activity numbers T04BU02933 and T04OT02398

1. Revise the grading plan to show compliance with the Floodplain Ordinance (Section 26-8 (d).
(1) In areas subject to flooding where no fill is proposed to be used, the building line shall be located no closer to the floodplain than the edge of the area subject to flooding by the base flood.
(2) In areas where fill is to be used to raise the elevation of the building site, the building line shall be located not less than twenty-five (25) feet landward from any edge of the fill, unless a study prepared by a state-registered professional civil engineer and approved by the city engineer shows that a lesser distance is acceptable. No fill shall be placed in any floodway; nor shall any fill be placed where it diverts, retards or obstructs the flow of water to such an extent that it creates a danger or hazard to life or property in the area.
2. Clearly indicate the extent of grading and limits of fill.
3. Clearly show that fill will not exceed two feet in depth at all locations on this parcel.
4. Show proposed location of any exterior accessory facilities such as air conditioning or other mechanical, electrical and plumbing facilities. All such facilities must be located at least one foot above the base flood elevation.
5. Provide the recording information for the access easement to lot b.

If you have any questions, please call me at 520.791.5550 ex 1161 or email at loren.makus@tucsonaz.gov.
01/12/2005 David Rivera ZONING REVIEW Denied 01/12/05

Development Services Department
Zoning Review Section

David Rivera
Senior Planner

Comments:

1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed.

2. Two copies of the approved and stamped site plan, landscape and NPPO plans sheets must be included with the next grading plan submittal.

3. Zoning will re-review the grading plan on the next submittal for compliance with the approved and stamped site plan.
12/13/2004 Andrew Connor NPPO REVIEW Denied 1) Site plan approval by remainming reviewing agencies is necessary to continue review.

2) Additonal comments may apply.

Final Status

Task End Date Reviewer's Name Type of Review Description
01/13/2005 LISA LESNY OUT TO CUSTOMER Completed
01/13/2005 ANGIE SHOFFSTALL REJECT SHELF Completed