Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Active
Review Details: GRADING
Permit Number - T04BU02868
Review Name: GRADING
Review Status: Active
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
12/01/2004 | ANY | ZONING | REVIEW | Active | |
12/06/2004 | Andrew Connor | NPPO | REVIEW | Denied | Include on the grading plan 6' wall indicated on the approved development plan sheet 4 of 6 keynote #9. |
12/30/2004 | MATT FLICK | ENGINEERING | REVIEW | Denied | DSD Engineering Review Comments for T04BU02868 Grading Plan Review: 1. Advisory: As long as no development occurs within the WASH study area, the Full Notice Procedure does not have to be implemented. Any disturbance of the study area will result in implementation of the full notice procedure. 2. The presence of the loading zone interferes with maneuverability for the solid waste pickup. Please revise to assure unobstructed access to the solid waste facilities. 3. The landscape plan shows a tree where the basin maintenance ramp is shown. 4. The detention/retention basin has not been designed with multi-use concepts as described in the Stormwater Detention/Retention Manual (DS 10-01). Please redesign accordingly. Of particular interest to Engineering is the inclusion of flatter sideslopes and other factors that affect the shape and size of the basin. Other agencies may also comment on this matter. 5. The public roadway plans were not reviewed as part of the grading plan submittal and should be resubmitted as per the PIA process. 6. Advisory: A floodplain use permit is not necessary unless the 100-year floodplain is disturbed or developed, whether intentional or unintentional. Above comments by: Matt Flick Engineering Manager 791-5550, ex. 1192 Matthew.Flick@tucsonaz.gov SWPPP Comments: |
12/30/2004 | MATT FLICK | ENGINEERING | REVIEW | Denied | The SWPPP was reviewed by Loren Makus. The SWPPP can be approved. Include two copies of the SWPPP with the grading permit resubmittal. |