Permit Review Detail
Review Status: Completed
Review Details: GRADING
Permit Number - T04BU02832
Review Name: GRADING
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/03/2005 | BLANCA ESPINO | ENGINEERING | REVIEW | Approved | Assignment by JPV. |
| 01/03/2005 | BLANCA ESPINO | ENGINEERING | REVIEW | Approved | Site/Grading Plan 1. Please include a response letter with the next submittal that states how all comments have been addressed. Include plans/redlines from previous plan submittal. 2. Remove incorrect "North arrow". 3. A location map should be drawn as follows D.S. 2-05.2.1.D A small, project-location map shall be drawn on the first sheet of the development plan, preferably in the upper right corner. The map should cover approximately one (1) square mile, be drawn at a minimum scale of 3" = 1 mile, and provide the following information. D.S. 2-05.2.1.D · Show the subject property approximately centered within the one square mile area. · Identify conditions within the square mile area, such as major streets and watercourses. · Section, township, and range; section corners; north arrow; and the scale will be labeled. 4. Indicate legal property description. D.S. 2-02.2.1.A.2 Indicate correct lot dimensions and bearings. A lot combination will be required. D.S. 2-02.2.1.A.5 5. Indicate location and orientation of existing major physical features, such as railroad tracks and drainageways. This can be indicated on the location map. D.S. 2-02.2.1.A.22 6. Indicate spot elevation if existing or proposed in legend. 7. Indicate new contour lines if any. 8. For an area of 1.62 acres, it appears that the proposed cut and fill quantities of 20 cubic yards is too low. Correct and revise. |
| 01/07/2005 | DAVID RIVERA | ZONING | REVIEW | Denied | 01/07/05 Development Services Department Zoning Review Section David Rivera Senior Planner Comments: 1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan until it the site plan has been approved, stamped and included with the grading plan. 2. Zoning is willing to review the grading plan over the counter once the lot combo issue has been resolved which which is a stipulation for approval of the site plan. Please contact me to set up an appointment if the applicant wishes to have the site plan, grading plan and building plans over the counter. |
| 12/22/2004 | Andrew Connor | NPPO | REVIEW | Denied | Site plan approval by remaining reviewing agencies is necessary to continue review. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 01/10/2005 | LISA LESNY | OUT TO CUSTOMER | Completed |