Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - GRADING ALL
Permit Number - T04BU02815
Review Name: RESUBMITTAL - GRADING ALL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/17/2005 | DOUG WILLIAMS | ENGINEERING | REVIEW | Denied | The majority of the previous comments have been addressed. The following items must be addressed/resolved prior to resubmittal of this grading plan/permit application: 1. The proposed sewer connection is not in conformance with subdivision platting requirements, and may not be approved by this office. 2. The Average Cross Slope (ACS) analysis, calculations, and notes indicate the proposed gradable area exceeds that allowed by the data provided. Additionally, the note specifying a minimum lot area of 2 acres is inconsistent with the plan submitted, and the platted lot area. 3. Provide slope, and slope treatment information for the fill area northeast of the proposed garage/driveway/retaining wall. 4. Provide a copy of Geotechnical recommendations, and assure all proposed slopes and treatment(s) conform to said recommendations. 5. Please refer to Development Standard 11-01.10.5 for paved interceptor drain construction requirements, and ensure grading plan details reflect conformance to such. 6. Section B-B does not appear consistent with the plan view grades provided - namely the spot elevation at the driveway entrance (2524.26) and proposed spot elevations at the driveway/swale area indicate higher ground onsite - please revise as necessary. Subsequent comments may be necessary upon resubmittal, depending on the nature and extent of revisions that occur to the plans. Please feel free to contact me at 791-5550 ext. 1189, or via email at Doug.williams@tucsonaz.gov if you have any questions, or wish to arrange a meeting to discuss these comments. Doug Williams Sr. Eng. Associate Engineering Division Development Services Dept. |
| 02/26/2005 | DAVID RIVERA | ZONING | REVIEW | Denied | 02/26/05 Development Services Department Zoning Review Section David Rivera Principal Planner Comments: 1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering. 2. If applicable provide a copy of the overall master grading plan for Montage Vista. the plan must depict the approved grading limits and pad. |