Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - GRADING
Permit Number - T04BU02640
Review Name: RESUBMITTAL - GRADING
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/20/2005 | LAITH ALSHAMI | ENGINEERING | REVIEW | Approved | Laith Alshami, 01/20/2005 The Grading Plan and the SWPPP are approved. However, please be advised that the Grading Plan is approved under the following premise: The Soils Report Addendum, dated December 10, 2004, states in the second paragraph of the "SLOPES" section, that "all structures should be set back from the edges of slopes a distance equal to the slope height, with a minimum setback distance of five feet for any slope". The City's interpretation of the previous statement is that the setback is measured from the top of the slope, and the mentioned slopes include cut and fill slopes and detention/retention basin side slopes where water might be ponding within the basins for prolonged periods of time. |
01/27/2005 | Andrew Connor | NPPO | REVIEW | Approv-Cond | |
02/03/2005 | DAVID RIVERA | ZONING | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
02/04/2005 | LISA LESNY | OUT TO CUSTOMER | Completed |