Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T04BU02272
Parcel: 99999999A

Review Status: Completed

Review Details: RESUBMITTAL - GRADING ALL

Permit Number - T04BU02272
Review Name: RESUBMITTAL - GRADING ALL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
12/01/2008 DAVID RIVERA ZONING REVIEW Denied 12/02/2008

Development Services Department
Zoning Review Section

David Rivera
Principal Planner

Comments:

1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan on this review.

2. Zoning could not verify that the grading plan was in compliance with the CDRC approved and stamped revised tentative plat plan. Please submit two copies of the CDRC approved and stamped tentative plat plans with the next grading plan submittal.

3. During the review process it was noted that there were many instances where the grading plan does not match the last submittal copy of the tentative plat. Some examples, the building footprints on the grading plan do not match or are the old footprints from the previously approved TP, sidewalks shown incorrectly, bicycle parking missing, parking spaces missing. It seems to me that if the tentative plat and grading plan drawings were supposed to have been revised to match as built conditions both plans would match. Zoning will not approve the grading plan and may request a re-draw of the tentative plat if there is inconsistency.

4. Zoning will re-review the grading plan on the next submittal to ensure compliance with the CDRC approved tentative plat plan. Additional comments may be forthcoming.
12/02/2008 ANDREW CONNOR NPPO REVIEW Needs Review 1. Submit a copy of the approved, and if necessary the revised tentative plat including landscape and native plant preservation plans for reference.

2. Ensure that all Engineering comments and concerns are addressed upon re-submittal.
12/16/2008 LAITH ALSHAMI ENGINEERING REVIEW Denied Laith Alshami, Engineering and Floodplain Review, 12/16/2008,

1- Submit a copy of the approved revised Tentative Plat for comparison.
2- Request a meeting with engineering before the next submittal to conduct an informal review of the revised grading plan to ensure approval by Engineering.