Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - GRADING
Permit Number - T04BU02254
Review Name: RESUBMITTAL - GRADING
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 12/17/2004 | DAVID RIVERA | ZONING | REVIEW | Approved | |
| 12/17/2004 | DOUG WILLIAMS | NPDES | REVIEW | Approved | Assure signed/dated Notices of Intent (NOI's) have been submitted to the Arizona Department of Environmental Quality (ADEQ). ADEQ authorization shall be included with the SWPPP (Part IV F). Please note stabilization and reseeding requirements under the CGP, and City of Tucson Development Standards (DS) as they may apply to desired phasing of this project: CGP "Deadlines for Stabilization": The operator must initiate stabilization measures within 14 days in portions of the site where construction activities have temporarily or permanently ceased. Stabilization measures must be initiated as soon as practicable. ii Where construction activity on a portion of the site is temporarily ceased, but earth disturbing activities will be resumed in that area within 14 days. In this event, temporary stabilization measures do not have to be initiated on that portion of site. iii. When the site is using vegetative stabilization but is located in an area with an average annual rainfall of < 20 inches and it is during seasonally arid conditions, vegetative stabilization measures must be initiated as soon as practicable. iv. When the site is using vegetative stabilization but is located in other areas of the state experiencing drought conditions (see definitions), vegetative stabilization measures must be initiated as soon as practicable. Reseeding (DS 11-01.2.3): A. For any site one acre or greater or portion thereof which has been wholly or partially grubbed or wholly or partially graded, construction shall commence and shall be continuous within sixty (60) days after grubbing. Should construction or grading not commence or be continuous within the required sixty- (60) day period, the site shall be native seeded within thirty (30) days following the expiration of the required sixty (60) day period. When approved by the Director of Development Services Department (DSD), a time extension may be granted for conditions beyond the control of the permitted for items such as flooding or the discovery of historic artifacts. Stabilization/reseeding requirements must be met on this project, and remain in effect as conditions of grading and SWPPP permit issuance. |
| 12/17/2004 | DOUG WILLIAMS | ENGINEERING | REVIEW | Approved | |
| 12/20/2004 | JOE LINVILLE | NPPO | REVIEW | Approv-Cond |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 12/22/2004 | ANGIE SHOFFSTALL | APPROVAL SHELF | Completed |
| 12/22/2004 | BETH GRANT | OUT TO CUSTOMER | Completed |