Permit Review Detail
Review Status: Completed
Review Details: GRADING
Permit Number - T04BU02254
Review Name: GRADING
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/17/2004 | Joseph Linville | NPPO | REVIEW | Denied | 1) Submit copies of the approved development plan including landscape and native plant preservation plans. Review of the plans will commence upon receipt of the requested documents. |
| 09/24/2004 | Doug Williams | ENGINEERING | REVIEW | Denied | Please see "greenline" mark-ups on plans - include all mark-up's with a revised grading plan package. Resubmittal shall include three (3) sets of grading and Stormwater Pollution Prevention Plans (SWPPP's), and 3 copies of the following: AZPDES (Construction General) Permit and signed/dated Notices of Intent (NOI's) submitted to ADEQ. Arizona Department of Environmental Quality (ADEQ) Authorization shall be included with the SWPPP (Part IV F). For additional construction SWPPP requirements, see the following link (hardcopy attached): http://www.azdeq.gov/environ/water/permits/download/cswppp.pdf Please note stabilization and reseeding requirements under the CGP, and City of Tucson Development Standards (DS) as they may apply to desired phasing of this project: CGP "Deadlines for Stabilization": The operator must initiate stabilization measures within 14 days in portions of the site where construction activities have temporarily or permanently ceased. Stabilization measures must be initiated as soon as practicable. ii Where construction activity on a portion of the site is temporarily ceased, but earth disturbing activities will be resumed in that area within 14 days. In this event, temporary stabilization measures do not have to be initiated on that portion of site. iii. When the site is using vegetative stabilization but is located in an area with an average annual rainfall of < 20 inches and it is during seasonally arid conditions, vegetative stabilization measures must be initiated as soon as practicable. iv. When the site is using vegetative stabilization but is located in other areas of the state experiencing drought conditions (see definitions), vegetative stabilization measures must be initiated as soon as practicable. Reseeding (DS 11-01.2.3): A. For any site one acre or greater or portion thereof which has been wholly or partially grubbed or wholly or partially graded, construction shall commence and shall be continuous within sixty (60) days after grubbing. Should construction or grading not commence or be continuous within the required sixty- (60) day period, the site shall be native seeded within thirty (30) days following the expiration of the required sixty (60) day period. When approved by the Director of Development Services Department (DSD), a time extension may be granted for conditions beyond the control of the permitted for items such as flooding or the discovery of historic artifacts. Stabilization/reseeding requirements will be grading and SWPPP permit issuance conditions. |
| 10/07/2004 | David Rivera | ZONING | REVIEW | Denied | October 7, 2004 Development Services Department Zoning Review Section David Rivera Senior Planner Comments: 1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering Review Section and until all zoning comments or concerns have been addressed. A site card with DSD approvals by Fire, Zoning, Handi-cap, Engineering, and Landscape/NPPO including the approved development plan stamped for site plan approval and signatures is required before the grading plan can be approved by Zoning. Two copies of the approved development plan, landscape and NPPO plans are to be submitted with the grading plans packet for processing and approval as a site plan. No fees are involved in re-stamping the development/tentative plat plans as an approved site plan. The development plan, may be walked through for stamps and site card sign off. submit the following: two copies of the stamped development plan, landscape and NPPO plans must be included with the grading plans packet processed together for site approval. 2. In addition two copies of the approved development plan and two copies of the approved and stamped landscape and NPPO plans must be included with grading plan. 3. Additional comments may be forthcoming on subsequent grading submittals. 4. Please define the phase lines. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 10/07/2004 | BETH GRANT | OUT TO CUSTOMER | Completed |
| 10/07/2004 | ANGIE SHOFFSTALL | REJECT SHELF | Completed |