Permit Review Detail
Review Status: Completed
Review Details: GRADING
Permit Number - T04BU02209
Review Name: GRADING
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/14/2004 | Andrew Connor | NPPO | REVIEW | Denied | Submit approved tentative plat including landscape and NPP plans to continue this review. |
09/28/2004 | Paul Machado | ENGINEERING | REVIEW | Denied | To: Rick Engineering Company, Inc. DATE: October 1, 2004 1745 E. River Road, Suite 101 Tucson, Arizona 85718 SUBJECT: 2660 N. Sahuara Ave., Bach Property Grading Plan T04BU02209 (First Review) T13S, R15E, Section 28 RESUBMITTAL REQUIRED: Grading Plan, Drainage Statement and SWPPP The Grading Plan (GP) and Drainage Statement (DS) cannot be approved as submitted. Please address the following review comments prior to the next submittal. Grading Plan: 1. Please include a response letter to the comments along with the corrected copies of the GP. 2. The GP cannot be approved prior to the approval of the tentative plat. Please submit the Approved 3. Three copies of the GP and two copies of the DR are required upon re-submittal. 4. The separate grading submittal for the barrow area will be required. 5. Please complete recording information for all easements prior to re-sumittal. 6. Add note: "Depress all landscaped areas a maximum of 6" for water harvesting". 7. Add note: "All grading and excavation shall conform to the grading standards per D.S. 11-01". 8. Please edit note 7 of the "Work to be Done" notes. 9. List administrative address/site address on plans. 10. Return curbs at the off site parking bays with wheel chair ramps shall be used instead of driveway aprons. The Permits and Codes section has also agreed to this requirement. 11. Please show the proposed roof drainage patterns, 100% of the 10-year flow must be conveyed under the sidewalks. If the location(s) of the roof scuppers have not yet been decided, add a general note indicating sidewalk scuppers (per COT/SD) will be used when the roof scuppers locations have been designed. 12. Key note 11 calls out for a wall opening detail and the detail is for grouted rip-rap. Please show the wall opening detail. 13. Key note 4 and 11 are almost the same. Please omit or correct either keynote. 14. Details N/2 and N/3 are not on the plans. 15. A permit or a private improvement agreement will be necessary for any work performed within the Right-of-way. Contact Permits and Codes at (520) 791-5100 for permit information. 16. Delineate 100-year W.S.E.L., Floodplain and erosion hazard setback for the Rose Hill Wash and Pantano Wash. 17. Please show the limits of grading. The limits should correspond with the 50' study area. Any disturbance in the 50' year study area will require a mitigation plan. 18. Cut or fill slopes require a 2' minimum setback from property line. Cut or fill slopes shall begin at 2' in from the property line. This includes the 2% cut area before the top of the steeper cuts. Please revise all plans and details to reflect this. 19. Call out all peak discharges entering and exiting the site. Drainage Statement: 1. Please include a response letter to the comments along with the corrected copies of the DS. 2. The DS cannot be accepted prior to the approval of the tentative plat. 3. Please include in the DS what impact the borrow area may have on the site. 4. Please address how the 39 cfs discharge and the discharge at the end of the end of the street at will be conveyed into Rose Hill Wash and what kind of soil protection is needed. 5. Delineate 100-year W.S.E.L., Floodplain and erosion hazard setback for the Rose Hill Wash and Pantano Wash. 6. Provide calculations for the conveyance for the 16 cfs through the 24" cmp. 7. Please show compliance for all weather access to the subdivision. Stormwater pollution prevention plan: Summary of Potential Pollutant Sources 1. Identify and address offsite material storage areas or borrow areas used solely by the operator's project. (Part IV.C.6) Stormwater Controls 2. Describe all pollution control measures (i.e., BMPs) that will be implemented as part of the construction project to control pollutants in stormwater discharges. (Part IV.D.1) For each major activity identified in the project description, the SWPPP must clearly describe appropriate control measures; the general sequence during the construction process that the measures will be implemented; and which operator is responsible for the control measure's implementation. (Part IV.D.1) NOTE: Offsite material storage areas (also including overburden and stockpiles of dirt, borrow areas, etc.) used solely by the permitted project are considered a part of the project and must be addressed in the SWPPP. 3. Show the concrete wash out area on the plans and label. If you have any questions, I can be reached at 791-5550 x1193 or Paul.Machado@tucsonaz.gov Paul P. Machado Senior Engineering Associate City of Tucson/Development Services Department 201 N. Stone Avenue P.O. Box 27210 Tucson, Arizona 85726-7210 (520) 791-5550 x1193 office (520) 879-8010 fax C:/2660 N. Sahuara Ave grad |
10/07/2004 | David Rivera | ZONING | REVIEW | Denied | October 7, 2004 Development Services Department Zoning Review Section David Rivera Senior Planner Comments: 1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering Review Section and Landscape Review Section until all zoning comments or concerns have been addressed. 2. In addition to the approved tentative plat copies, two copies of the approved and stamped landscape and NPPO plans must be included with grading plan. 3. Add the interior street names and the street name "Sahuara Avenue". 4. Additional comments may be forthcoming based approved tentative plat and revised grading plan. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
10/07/2004 | DELMA ROBEY | OUT TO CUSTOMER | Completed |